Relocation of the Whittier Covered Bridge
Project Information
- Project Location:
- NH
- Status:
- Completed - Jan 2008
- Structure Type:
- Bridge
Scope Of Work
Design and install major emergency stabilization of the deteriorated trusses
Whittier Covered Bridge built 1870
144' Paddleford arch truss
Design and installed temporary shoring in the river and rolled bridge onto dry land
Owner: The town of Ossipee, N.H.
Engineer: Hoyle Tanner & Associates
Contact: Sean James