FortEco Framing Company
Hartland, WI 53029
Featured Project Return to Projects List
Five Diamonds Mezzanine
Project Information
- Project Location:
- Waukesha, WI
- Status:
- Completed
- Structure Type:
- Athletic Field
Scope Of Work
The FORTECO Floor Framing was panelized for this project and installed in a fraction of the time it takes to install standard structural steel framing This 43,000 sq. st. building was designed and engineered by Jendusa Design & Engineering , the engineering company owned by the Founder of Forteco Framing Co.
FORTECO Lightweight Composite Floor Framing System for 2nd floor of 5 Diamonds Mezzanine Sports Facility
FORTECO framing used fully engineered, assembles panels. The panels can be individually handled and placed in position. This made the construction much simpler.
FORTECO Lightweight Composite Framing | Assembled Frames Provide Modular Solution for Construction | FORTECO Frames Can be Fully Assembled and Delivered to the Construction Site
FORTECO frames are light weight. The metal studs were enough to bear the frame. This is an advantage for constructing floors using FORTECO, as there is no requirement to build an extensive load bearing structure.
FORTECO Frames Are Light Weight Minimizing Requirements for Extensive Support Structure