Logo

Sustainable Group, Inc.

Share

Moraga, CA 94556

Company Info

  • Size 1-4 Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

U. S. Coast Guard Sector

Project Information

Project Location:
San Francisco, CA
Status:
Completed
Structure Type:
Government
LEED Certification (target):
Certified

Scope Of Work

The U.S. Coast Guard Patrol Boat Pier located at the Sector San Francisco Yerba Buena Island Facility utilizes concrete wave panels to protect the boats from wave action in the San Francisco Bay. These panels have failed over the years and most recently three of the 14-ton concrete panels have fallen off the face of the pier and are now embedded in the bottom of the San Francisco Bay. This project attempted to raise the three panels; repair, then reinstall them; and reinforce the pier-to-pile connections for the panel system. Two 40-ton cranes with vibratory equipment attached attempted to raise the panels, however the depth of embedment in the bottom of the bay coupled with the neoprene rubber used to wedge the panels in place did not allow the panels to be recovered. A dive team was deployed to cut one of the panels at the mudline to aid vessel navigation in the area. In addition, two composite timber and concrete panels were constructed and used to replace the two missing panels (a similar panel was placed in 2016 to replace the third panel). Other elements of work included the replacement of broken connection hardware and the repair of cracked concrete with epoxy cement on two of the floating docks which were heavily damaged during the winter storms of 2017. Despite several challenges related to the non-recovery of the sunken panels, Sustainable Group successfully installed the new composite panels and repaired the floating docks. This successful accomplishment in turn protected Coast Guard Patrol Boat assets in advance of the approaching 2018 winter storm season. Sustainable Group key personnel self-performed many of the construction activities for this project including the installation of 38 heavy duty plates to reinforce the pier-to-pile connections, the on-site construction and installation of the new wave panels and the repairs to the floating docks. On-site construction management, safety oversight, and Quality Control/ Quality Assurance (QA/QC) services were also self-performed.

Project Images

#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/1162796/sustainable-group-inc/general-contractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.