Featured Project Return to Projects List
Chino Meadows Units 2 & 5
Project Information
- Project Location:
- Chino Valley, AZ
- Status:
- In-Progress
- Structure Type:
- Sewage / Water Treatment Plant
Scope Of Work
CLM is the General Contractor on this project which consisted of a 6 month timeframe with Mass Grading, Channelization, Installation of Geocomposite drainage mats and installation of both pre-cast and cast-in-place box culverts.
CLEAR & GRUB
CHANNELIZATION
EROSION CONTROL FABRIC
MASS GRADING
BOX CULVERTS
PAVING