LADWP, Silver Lake Reservoir Complete Storage Replacement Project

Project Information

Project Location:
Los Angeles, CA
Approx Contract:
$300,000,000
Status:
Completed - Dec 2020
Structure Type:
Sewage / Water Treatment Plant

Scope Of Work

Phase 1

W. M. Lyles Co. has teamed with Webcor Builders and Obayashi Corporation to form Webcor, Obayashi, Lyles, (WOL) a Joint Venture CMAR for the Silverlake Complex Storage Replacement Project. WOL provides construction services and design support for LADWP to meet Federal Water Quality Regulations by con-structing two underground reservoirs and a 96’’ diameter pipeline which will re-place the operational function of the existing Silverlake and Ivanhoe reservoirs. Phase 1 of the project consists of the construction of a 55 million gallon concrete reservoir, connecting piping and a 3,000 foot long 12 foot diameter tunnel.

Phase 2

Phase 2 consists of the construction of a 60 million gallon concrete reservoir, inlet and outlet piping and installation of 840 lf of 78” diameter steel pipeline.

Share URL copied!
https://www.thebluebook.com/iProView/1193953/w-m-lyles-co/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.