T-Hangar Door Replacement Phase, I, II, III
Project Information
- Project Location:
- Punta Gorda, FL
- Status:
- Completed
- Structure Type:
- Terminal - Airport / Bus / Railroad
Scope Of Work
The project consisted of providing all labor, materials, equipment and design to replace sixty-four (64) existing aircraft T-hangar doors. The existing bi-fold doors were replaced by new hydraulic doors in order to provide doors able to meet the new South Florida Building Code wind requirements of 176mph. The design and construction included the mechanical drive systems, upper guide rollers, ground rail assembly, bumper stops, exterior and cladding, weather seals and electrical systems.
Punta Gorda Airport was ranked one of North America’s Airport Leaders on the 2019 OAG Report. PGD is the third-fastest growing airport in the country, according to Florida Department of Transportation.