Featured Project Return to Projects List
Brew Dr. Kombucha
Project Information
- Project Location:
- Tualitin, OR
- Approx Contract:
- $100,000
- Status:
- Completed - Jan 2016
- Structure Type:
- Office Building
References
- General Contractor:
- O’Brien Construction
Scope Of Work
Drywall System: 5/8” Type X with level 4 smooth finish, double layer at 2-hour walls
Framing of wood walls, Boiler room, and Cooler Equipment room Mezzanines
Infill openings in exterior wall with framing and sheathing
Acoustical insulation R-21 Mineral fiber bats material & labor
FRP: Standard stock white: Shower room up 8’ all walls, Utility rm up 4’ at mop sink, Fermentation rm up 4’ all walls, Bottling up 4’ west wall, Loading up 4’ west wall, 2 restrooms up 4’ at 2 wet walls
Schedule