Contaminant Control, Inc.
Salisbury, NC 28146
Featured Project Return to Projects List
ASBESTOS ABATEMENT PROJECTS
Project Information
- Project Location:
- New Orleans, LA
- Status:
- Completed
- Structure Type:
- Misc Project
Scope Of Work
CCI completed the asbestos abatement and demolition of the 17 story 680,000 sq ft. Pallas Hotel located in New Orleans LA. The project consisted of: removong interior walls, floor tile, pipe insulation, water proofing, roofing and caulking around the windows that tested positive for asbestos containing materials. After the building was abated, CCI then prepared the building for implosion by completing the necessary interior and exterior demolition. It took 400 lbs of explosives and 8 seconds to bring down the building that stod 35 feet from Interstae 10. All adjacent structures were left in place with no resulting damage.