Logo

KCI Technologies

Share

Dover, DE 19901

Company Info

  • Est. 1955
  • Size 500+ Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Bell Lincoln Multi-Cultural Middle and High School Campus

Project Information

Project Location:
Washington, DC
Approx Contract:
$50,000,000
Status:
Completed
Structure Type:
School / College / University

References

Client:
SHW Architects US Army Corps of Engineers

Scope Of Work

As part of a joint venture with SHW Group, KCI provided comprehensive architectural/engineering services for the design of a new $55 million, 325,000-square-foot multicultural school campus. The project included consolidating the functions of a middle school and a high school into a single building.

Prior to demolition, Bell High School and Lincoln Middle School were inundated with leaky roofs, asbestos-containing materials, ill-equipped science laboratories, limited recreation areas, poor space configurations and virtually no computer infrastructure.

Now connected under one roof, the new facility includes a three-story middle school, a four-story high school, an 800-seat auditorium with a mini-United Nations stage, a two-story multi-purpose building and below grade parking.

A major challenge with this project was maximizing the benefits of shared mechanical systems for both schools under one roof. KCI’s engineers focused on providing efficient and cost effective solutions using innovative HVAC systems throughout the facility. Designers also worked with stakeholders to maximize utilization of the small five-acre site while minimizing impacts to the surrounding community.

Project Images

#
#
Share URL copied!
https://www.thebluebook.com/iProView/1224045/kci-technologies/general-contractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.