Logo

TGE Resources, Inc.

Houston, TX 77040

Company Info

  • Est. 1994
  • Size 20-49 Employees
  • Annual Vol $3 million - $6 million
  • DUNS # 929-574-051

Featured Project Return to Projects List

Emerus Hospitals

Project Information

Project Location:
Las Vegas, NV
Approx Contract:
$200,000
Status:
Completed
Structure Type:
Hospital / Nursing Home
Services Rendered:
Env. Engr. & Consulting--General:
Environmental Due Diligence
Industrial Hygiene (IH)
Environmental Engineering
Environmental Remediation
Environmental Compliance
Asbestos Services
Air Quality Consulting
VIMS
Environmental Consulting
Soil Testing
Environmental Risk Assessments
Environmental Site Assessments
Air Quality Testing
Air Monitoring
Inspection Surveys
Environmental Assessments
Post Construction Services
Phase I & II Site Assessments
Underground Storage Tanks
Site Assessments
Asbestos Inspections
Environmental Site Assessment
Asbestos and Lead Services
Asbestos Consultant for Provider
Environmental Engineering
Haz. Mtls.Remediation & Disposal
Engineering & Consulting Service
Environmental Studies
Commercial Real Estate
IAQ Services
Remediation System Installation
Vapor Intrusion
WBE Certified
Asbestos Services
Assessment And Remediation
Phase II Site Investigations
Subsurface Investigations
Env. Permitting
GIS & Mapping
Asbestos, Lead & Mold Inspection
Environmental Testing/Monitoring

References

Owner:
Emerus Healthcare

Scope Of Work

Planned redevelopment of a 1960s-era automobile dealership property with extensive vehicle service/body shops and an adjoining former retail gas station tract. Following purchase, the dealership was to have three existing structures demolished for redevelopment as an emergency care hospital and medical office building. Obstacles included: The presence of 35+ in-ground hydraulic lifts, an oil-water separator, historic septic tanks, petroleum hydrocarbon ASTs, and numerous regulated/hazardous chemicals The presence of asbestos-containing materials within existing site structures.Thorough due diligence assessments and hazardous materials inventory were performed. Given progressive site development that preceded demolition, asbestos and other hazardous materials required turn-key removal prior to demolition. TGE expedited seamless abatement of all hazardous materials within the buildings. Prior to building demolition, all 35+ in-ground hydraulic lifts, service bay trench drains, oil-water separators, and septic systems at the site were properly removed and affected property remediated. TGE engineered a vapor intrusion mitigation system, which was installed with engineering oversight and post-construction system testing to demonstrate compliance and occupant safety.  TGE’s efforts were successful in enabling site redevelopment with fully compliant asbestos abatement, expedited regulatory case closure for impacted soil, and the installation of engineering controls within the newly-constructed sensitive use building to protect the health of building occupants/patrons.

Project Images

#
#
#
#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/1254331/tge-resources-inc/subcontractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.