Featured Project Return to Projects List

Jewish Federation

Project Information

Project Location:
PA
Approx Contract:
$3,000,000
Status:
Completed
Structure Type:
Government

Scope Of Work

A community center in Southern New Jersey has taken its commitment to improving the environment while slashing operational costs to the next level with the completion of a Phase 2 project featuring onsite generation. 

The Jewish Federation of Southern New Jersey (JFED) serves members of the wider community through a variety of agencies, including the Katz Jewish Community Center, which together aim to support those in need while enhancing Jewish life locally and around the world. The Cherry Hill campus is comprised of a number of uses including athletic, educational, office, and event facilities.

Building on the success of the Phase 1 project where Ecosave installed efficient building upgrades to deliver energy savings under a shared savings model – the Ecosave Services Agreement (ESA) – JFED has once again partnered with Ecosave to find creative solutions for its most recent operational and financial objectives. 

Faced with failing, end-of-life boiler equipment, Ecosave engineers saw an opportunity to complement the energy savings delivered under the Phase 1 ESA with an onsite combined heat and power plant (CHP). A new, state-of-the-art CHP plant was designed to generate electricity and provide hot water for space heating, domestic hot water, and pool heating while eliminating the need to replace failing boiler equipment. This new energy configuration has resulted in JFED cutting electricity consumption by 65% and drastically reducing reliance on the grid!

For a zero-dollar upfront capital outlay and no debt, JFED has received almost $2.7M in building upgrades and over $332k per year in operational savings. While in most cases the ESA is geared to deliver guaranteed savings in excess of the fee, JFED elected to have additional measures installed and was excited that the majority of their fee would be paid for out of savings while avoiding debt on their balance sheet.

Energy reduction and onsite generation measures implemented include: 

Installation of a 150kW state-of-the-art modular combined heat and power (CHP) plant system to generate electricity and hot water.

Two new condensing boilers were installed to supplement the new CHP system and replace end-of-life equipment.

Replacement of rooftop units with high efficiency units appropriately sized to avoid unnecessary usage as well as reduce maintenance costs. 

LED lighting upgrade across entire campus.

Optimization of water source heat pump, makeup air unit, and pool dehumidification system to reduce energy waste.

Replacement of 60 heat pumps with high efficiency models.

Installation and optimization of a new Building Automation System.

Energy management services delivered by Ecosave Watch whereby Ecosave engineers constantly monitor and analyze building usage to provide regular reports and conduct meetings to discuss ways to drive down consumption.

Comprehensive mechanical and building controls maintenance services on installed equipment.

Share URL copied!
https://www.thebluebook.com/iProView/1259418/ecosave/general-contractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.