Logo

Maloney Construction, Inc.

Novato, CA 94949

Company Info

  • Est. 1996
  • Size 20-49 Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Federal Highway Administration

Project Information

Project Location:
Yosemite National Park, CA
Status:
Completed
Structure Type:
Road / Highway

Scope Of Work

Maloney Construction  the Yosemite National Park Tunnel Preservation project in less than 45 working days and with no weekend closures. Inside the tunnel roadway Maloney Construction also replaced and restored the drainage system.

The project required specialized, highly technical work within the tunnels while maintaining one lane of traffic at all times. Concrete spall repairs required location of the actual extent of deteriorated or delaminated concrete by the contractor, including location of the existing reinforcing bars. Chemical grout injection repairs required qualified personnel with documented previous experience. Acceptance of the grout injection repairs was based on performance requirements for stopping leaks.

All concrete pavement and spall repairs were integrally colored to match existing treatments, and colored joint sealant matched adjacent sidewalks. All wash water from power washing operations was contained and filtered before being discharged or disposed of.

Project Images

#
#
Share URL copied!
https://www.thebluebook.com/iProView/1292777/maloney-construction-inc/subcontractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.