Pier 39 - The Plunge - Indoor Entertainment

Project Information

Project Location:
San Francisco, CA
Status:
Completed
Structure Type:
Misc Project

References

Owner:
Indoor Entertainment
General Contractor:
Valentine Corp

Scope Of Work

The project consists of helical piles that were drilled through the concrete floor of the pier, down 20’ to the sea floor and then 60’ into the bay muds that underlie the area. All of the work was done during the night and we had to be careful not to damage the historic pier.

We used three different kinds of material, all CHANCE Helical piles.

The lead sections were the SS175 (1 ¾”) square shaft material having a 10”-12”-14” helixes on a 7’ shaft and another 14” helix on a 4’ extension shaft. Because of the weak soils, we transitioned into the RS3500 (3.5”) material and then to a 8” shaft material embedded 10’ into the sea floor and up through the water and air into the new concrete grade beams.

The combination of using tight access equipment and ability to achieve high load capacities made this unique project a perfect one for the Maloney Team!

Project Images

#
#
#
#
#
#
#
#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/1292777/maloney-construction-inc/subcontractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.