Logo

Maloney Construction, Inc.

Novato, CA 94949

Company Info

  • Est. 1996
  • Size 20-49 Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

US Army Corps of Engineers

Project Information

Project Location:
Sacramento, CA
Status:
Completed
Structure Type:
Government

Scope Of Work

Replacement of Pumping Plant 4 with outlet pipes to be relocated through the levee at an elevation above the 200 year water surface elevation.

Sacramento’s Natomas Basin is one of the most at-risk areas in the nation for catastrophic flooding. Improvements to Natomas levees were originally authorized as part of the Corps’ American River Common Features project in 1996, intended to improve the system of levees the greater Sacramento area. The work includes but is not limited to the removal of the existing Pumping Plant 4 building and trash rack and reconfiguring the pump station intake and installing a new trash rack. The project also includes replacement of Pumping Plant 4 with outlet pipes to be relocated through the levee at an elevation above the 200 year water surface elevation. The work also includes removal of pipes crossing through the levee at the abandoned Bennett and Northern Pumping Stations in addition to removing the concrete structures on both the waterside and landside.

Share URL copied!
https://www.thebluebook.com/iProView/1292777/maloney-construction-inc/subcontractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.