Mass. Electric Construction Co. (MEC) worked as a subcontractor to Kiewit Pacific Co. at the Bakersfield Waste Water Treatment Plant (WWTP). The project entailed the construction and upgrade of the WWTP from a 16mgd to 32mgd capacity plant.
MEC’s work included the following:
Installation of a new 12,000-volt service and plant power loop feeder
system
Installation of a new self-healing fiber-optic SCADA loop incorporating
new and existing facilities
Associated power distribution, lighting, and process controls for:
A new headworks structure
The conversion of four (4) existing secondary clarifiers into primary clarifiers
A new activated sludge secondary treatment system including a new blower building, new aeration basin, and four (4) new secondary clarifiers
A new 2mgd tertiary treatment system (cloth media filtration,
chemical feed system, and the reclaimed water storage system)
Two (2) new anaerobic sludge digesters & sludge dewatering
building
A new power cogeneration building
The new administration and operations buildings and plant
maintenance facility