Mass. Electric Construction Co.
Greenbelt, MD 20770
Featured Project Return to Projects List
Sugar Land Surface Water Treatment Plant
Project Information
- Project Location:
- Sugar Land, TX
- Status:
- Completed
- Structure Type:
- Manufacturing Plant
Scope Of Work
Mass. Electric Construction Co. (MEC) was the electrical subcontractor on the Sugar Land Surface Water Treatment Plant Project. Located on a 40-acre greenfield site, regulatory mandates from county and state levels required the City of Sugar Land and seventeen surrounding municipalities to provide 30% of the water supply from surface sources by 2016.
The new plant, completed in 2014, provides residents a water blend ratio of 30% surface to 70% groundwater. The new water treatment plant utilizes surface water from nearby Oyster Creek, an offshoot of the Brazos River, to produce nine million gallons of potable water per day. The completed plant is the largest capital improvement project ever for the City.
MEC installed all power & lighting for the new plant, as well the following:
instrumentation & controls
electrical equipment
lightning protection
communication & SCADA systems
grounding & terminations
manholes
conduit & duct banks
medium & low voltage cabling
junction boxes
cathodic protection
security & fire alarm systems
low voltage switchboards & medium voltage manual switches
distribution panel boards & transformers
48VDC battery system