Binsky completed the HVAC and plumbing work for the 360,000-square foot LG North American Headquarters. Using LG Equipment, Binsky installed the largest water-cooled variable refrigerant flow (VRF) system in North America. Also, due to overall building space limitations, Binsky utilized modular solutions to ensure all equipment fit as designed.Prefabrication was utilized on more than 50% of this project, including all cast iron piping. The project was completed with zero injuries with 78,000 man hours worked.
Additional scope of work included:
Total Capacity of Cooling –1,310 Tons
Total Capacity of Heating –17,667,000 BTUs
Total Footage of Refrigerant Piping –50,000 FT
Total Footage of Condenser Water Piping –18,000 FT
Binsky was awarded the HVAC and mechanical work for the development of the new 360,000-square foot corporate campus located on a 27-acre site. Although this project was not structured as a traditional “design assist”, Binsky provided layout and coordination well above the standard norm. Due to limited space in the mechanical room, Binsky utilized modular solutions to ensure all equipment fit as designed. Prefabrication was utilized on more than 50% of this project, including all cast iron piping.
Additional scope of work included installation of 18,000-feet of condenser water piping, 50,000-feet of refrigerant piping, and equipment with 1,310 tons of cooling capacity, and 17,667,000 BTU heating capacity.