AAES, Inc.

San Francisco, CA 94105

Company Info

  • Est. 1989
  • Annual Vol Not Provided

People Also View These
Loading...

Our Story

Our main lines of business include: Engineers--Consulting.

AAES, Inc. has been listed in the Blue Book since 2006.

What We Do

  • Engineers--Consulting

Commercial Experience

Regions & Counties Serviced

  • California-Central Valley-Sacramento, Fresno, Bakersfield

California 1

  • Stanislaus

Our CSI Codes

01 21 43 - Time Allowances
01 45 26 - Plant Inspection Procedures
01 71 23 - Field Engineering
01 71 23.13 - Construction Layout
01 71 23.16 - Construction Surveying
01 80 00.00.01 - Performance Requirements
01 82 13 - Foundation Performance Requirements
01 82 16 - Basement Construction Performance Requirements
01 83 13 - Superstructure Performance Requirements
01 83 16 - Exterior Enclosure Performance Requirements
01 84 16 - Stairways Performance Requirements
01 86 13 - Fire Suppression Performance Requirements
01 86 16 - Plumbing Performance Requirements
01 86 19 - HVAC Performance Requirements
01 86 23 - Integrated Automation Performance Requirements
01 86 26 - Electrical Performance Requirements
01 86 29 - Communications Performance Requirements
01 86 33 - Electronic Safety and Security Performance Requirements
01 88 13 - Special Construction Performance Requirements
01 91 13 - General Commissioning Requirements
01 91 16.13 - Foundation Commissioning
01 91 16.53 - Basement Construction Commissioning
01 91 19 - Facility Shell Commissioning
01 91 19.13 - Superstructure Commissioning
01 91 19.43 - Exterior Enclosure Commissioning
02 06 30 - Schedules for Subsurface Investigations
02 08 00.00.01 - Commissioning of Existing Conditions
02 22 19 - Traffic Assessment
02 25 16 - Existing Concrete Assessment
02 25 19 - Existing Masonry Assessment
02 25 23 - Existing Metals Assessment
02 25 23.13 - Welding Investigations
02 25 26 - Existing Wood, Plastics, and Composites Assessment
02 31 29 - Magnetotelluric Investigations
02 32 23 - Geotechnical Monitoring Before Construction
05 08 00.00.01 - Commissioning of Metals
06 08 00.00.01 - Commissioning of Wood, Plastics, and Composites
08 01 74 - Operation and Maintenance of Access Control Hardware
08 74 19 - Biometric Identity Access Control Hardware
10 08 00.00.01 - Commissioning of Specialties
11 08 00.00.01 - Commissioning of Equipment
11 14 13.13 - Portable Posts and Railings
11 14 13.16 - Rotary Gates
11 14 13.19 - Turnstiles
13 08 11 - Commissioning of Swimming Pools
13 08 23 - Commissioning of Planetariums
13 08 30 - Commissioning of Special Structures
21 08 00.00.01 - Commissioning of Fire Suppression
22 08 00.00.01 - Commissioning of Plumbing
23 08 00.00.01 - Commissioning of HVAC
25 08 00.00.01 - Commissioning of Integrated Automation
25 58 00.00.01 - Integrated Automation Control of Electronic Safety and Security Systems
25 98 00.00.01 - Integrated Automation Control Sequences for Electronic Safety and Security Systems
26 05 73 - Overcurrent Protective Device Coordination Study
26 08 00.00.01 - Commissioning of Electrical Systems
27 08 00.00.01 - Commissioning of Communications
27 11 13 - Communications Entrance Protection
28 01 10 - Operation and Maintenance of Electronic Access Control and Intrusion Detection
28 01 10.51 - Maintenance and Administration of Electronic Access Control and Intrusion Detection
28 01 10.71 - Revisions and Upgrades of Electronic Access Control and Intrusion Detection
28 01 20 - Operation and Maintenance of Electronic Surveillance
28 05 26 - Grounding and Bonding for Electronic Safety and Security
28 05 28 - Pathways for Electronic Safety and Security
28 06 10 - Schedules for Electronic Access Control and Intrusion Detection
28 06 20 - Schedules for Electronic Surveillance
28 06 40 - Schedules for Electronic Monitoring and Control
28 08 00.00.01 - Commissioning of Electronic Safety and Security
28 10 00.00.01 - Electronic Access Control and Intrusion Detection
28 13 13 - Access Control Global Applications
28 13 16 - Access Control Systems and Database Management
28 13 19 - Access Control Systems Infrastructure
28 13 26 - Access Control Remote Devices
28 13 33 - Access Control Interfaces
28 13 33.16 - Access Control Interfaces to Access Control Hardware
28 13 33.26 - Access Control Interfaces to Intrusion Detection
28 13 33.33 - Access Control Interfaces to Video Surveillance
28 13 33.36 - Access Control Interfaces to Fire Alarm
28 13 43 - Access Control Identification Management Systems
28 13 53 - Security Access Detection
28 13 53.29 - Security Access Sniffing Equipment
28 16 13 - Intrusion Detection Control, GUI, and Logic Systems
28 16 16 - Intrusion Detection Systems Infrastructure
28 16 19 - Intrusion Detection Remote Devices and Sensors
28 16 33.13 - Intrusion Detection Interfaces to Remote Monitoring
28 16 33.16 - Intrusion Detection Interfaces to Access Control Hardware
28 16 33.23 - Intrusion Detection Interfaces to Access Control System
28 16 33.33 - Intrusion Detection Interfaces to Video Surveillance
28 16 43 - Perimeter Security Systems
28 20 00.00.01 - Electronic Surveillance
28 23 13 - Video Surveillance Control and Management Systems
28 23 16 - Video Surveillance Monitoring and Supervisory Interfaces
28 23 19 - Digital Video Recorders and Analog Recording Devices
28 23 23 - Video Surveillance Systems Infrastructure
28 23 26 - Video Surveillance Remote Positioning Equipment
28 23 29 - Video Surveillance Remote Devices and Sensors
28 26 13 - Electronic Personal Safety Detection Systems
28 26 19 - Electronic Personal Safety Interfaces to Remote Monitoring
28 31 33.16 - Fire Detection and Alarm Interfaces to Access Control Hardware
28 31 33.23 - Fire Detection and Alarm Interfaces to Access Control System
28 31 33.33 - Fire Detection and Alarm Interfaces to Video Surveillance
31 08 00.00.01 - Commissioning of Earthwork
31 09 13 - Geotechnical Instrumentation and Monitoring
31 09 16 - Special Foundation and Load Bearing Elements Instrumentation and Monitoring
31 09 16.13 - Foundation Performance Instrumentation
31 09 16.26 - Bored and Augered Pile Load Tests
32 08 00.00.01 - Commissioning of Exterior Improvements
33 08 10 - Commissioning of Water Utilities
33 08 20 - Commissioning of Wells
33 08 30 - Commissioning of Sanitary Sewerage Utilities
33 08 40 - Commissioning of Storm Drainage Utilities
33 08 50 - Commissioning of Fuel Distribution Utilities
33 08 60 - Commissioning of Hydronic and Steam Energy Utilities
33 08 70 - Commissioning of Electrical Utilities
33 08 80 - Commissioning of Communications Utilities
34 08 13 - Commissioning of Roadways
34 08 23 - Commissioning of Railways
34 08 33 - Commissioning of Airfields
34 08 43 - Commissioning of Bridges
34 54 33 - Passenger Fare Gates
35 08 30 - Commissioning of Coastal Construction
35 08 40 - Commissioning of Waterway Construction
35 08 50 - Commissioning of Marine Construction
35 08 70 - Commissioning of Dams
40 80 00.00.01 - Commissioning of Process Systems
41 08 30 - Commissioning of Manufacturing Equipment
42 08 10 - Commissioning of Heating Equipment
42 08 20 - Commissioning of Cooling Equipment
42 08 30 - Commissioning of Drying Equipment
43 08 10 - Commissioning of Gas Handling Equipment
43 08 20 - Commissioning of Liquid Handling Equipment
43 08 30 - Commissioning of Gas and Liquid Purification Equipment
43 08 40 - Commissioning of Gas and Liquid Storage
44 08 40 - Commissioning Water Treatment Equipment
45 08 00.00.01 - Commissioning of Industry-Specific Manufacturing Equipment
48 08 00.00.01 - Commissioning of Electrical Power Generation

Project Experience

  • Union
  • Non-Union
  • Public
  • Private
  • Projects From $2,000,000 to $2,000,000,000
Share URL copied!
https://www.thebluebook.com/iProView/1311705/aaes-inc/engineers/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.