Mule Engineering & Construction, Inc.
Winter Garden, FL 34787
Featured Project Return to Projects List
Robins Air Force Base Building 673 - Repair/Renovate Interior
Project Information
- Project Location:
- Robins Air Force Base, GA
- Status:
- Completed
- Structure Type:
- Military
References
- Client:
- Robins Air Force Base
Scope Of Work
MULE completed a design-build renovation of the north wing of Bldg 673 to include: complete re-roof with change in pitch of roof to match the south wing; complete demolition and replacement of metal wall panels and insulation; structural steel changes to the north end wall to accommodate a new, larger overhead coiling door; expansion of existing vehicle ramps to accommodate larger vehicles and loads; extension of the existing sanitary sewer manhole; new lightning protection system for the entire building, canopy and CO2 tower; construction of two new CMU rooms (PPE and Locker) within the building; significant upgrade of electrical service to include more than doubling capacity of transformer, new interior building transformer, new service and distribution panel and subpanels, new lighting and fire alarm for entire structure; extension of fire suppression system for new sanding booth; new HVAC for the north wing and the new PPE and Locker Room; plumbing for new eyewash station and PPE room sinks; new steel railings and bollards; interior and exterior paint (new and refinishing). Heavy metals were detected during design and remediation of the interior will be completed prior to the start of construction.