Featured Project Return to Projects List

Giant Laundry

Project Information

Project Location:
Vineland, NJ
Approx Contract:
$1,000,000
Status:
In-Progress
Structure Type:
Misc Project
Products Used:
Plumbing Contractors:
Backflow Certifications
Natural Gas Piping
Plumbing Contractors
Water Line Repair & Replacement
Water Pump Install & Repairs
Backflow Installation
Bathroom Plumbing Contractors
Bidding & Contracting
Pipe Insulation
Tank Installation & Removal
Services Rendered:
Plumbing Contractors:
Backflow Certifications
Natural Gas Piping
Plumbing Contractors
Water Line Repair & Replacement
Water Pump Install & Repairs
Backflow Installation
Bathroom Plumbing Contractors
Bidding & Contracting
Pipe Insulation
Tank Installation & Removal

References

General Contractor:
Integrity Plumbing

Scope Of Work

Laundromat Fit-Out

General & plumbing contractor overseeing electrical, framing/drywall and HVAC work

Plumbing scope includes:

  • Excavation, backfill and compaction
  • Furnished and installed the following:
    • PVC above and below slab for sanitary waste and vent piping
    • Domestic water piping, main and branch lines
    • Thermal pipe high-density fiberglass insulation
    • Black steel natural gas piping, valves, fittings, and hangers
    • Natural gas regulators
    • Sanitary sewer connection on exterior of building at existing manhole
    • Flush system and sterilize domestic water piping
    • Fiberglass pipe insulation on all domestic water piping, hot, cold, and recirculation
    • Storm piping repairs at the back of the warehouse building
      •  2" Zone backflow prevention device with airgap fittings, drains, hangers and supplies
      • Boiler systems with one holding tank
    • Pumps, controls, aquastats
    • Floor drains with traps
    • In floor & in wall clean outs
    • RPZ back flow preventers & certification
    • (2) new 2" water service, originating on exterior of building
    • Interior domestic water mains & branch lines
    • Vent through roof
    • All Fixtures & faucets as per plans
    • Mop sink & faucets
    • Floor sinks & indirect waste piping
    • All valves, fittings & piping
    • Hangers & supports
    • Piping I.D. markings
    • Natural gas piping to all gas-fired equipment including water heaters, dryers, furnaces
    • PVC condensate discharge originating at the furnace unit and discharging to standpipes in the mechanical room
    • Sanitary pipe to extend 5 feet outside of the foundation wall and connect to new sewer
    • Natural gas regulators installed for all gas-fired equipment
    • Water service supplying the building
    • Connect to existing domestic water from bathroom groups
    • Separate Sewer to service the warehouse
    • Separate Gas to service the warehouse

Project Images

#
#
#
#
#
#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/1389353/integrity-plumbing/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.