Logo

K&K Heating & Air

Share

Gilbert, AZ 85234

Company Info

  • Est. 2018
  • Size 1-4 Employees
  • Annual Vol $500,000 - $1 million
  • DUNS # 121053526

Featured Project Return to Projects List

Purpose Church

Project Information

Project Location:
Pomona, CA
Approx Contract:
$90,000
Status:
Completed - Mar 2024
Structure Type:
Church / Synagogue
LEED Certification (target):
Silver
Services Rendered:
Air Conditioning Contractors:
Heating & Air Conditioning HVAC
Air Conditioning Installation
Duct Work

References

Owner:
Not Provided
Architect:
Not Provided
General Contractor:
Not Provided
Client:
Tim McAnlis
(909) 726-9654
Tim McAnlis

Scope Of Work

SCOPE

TRANE 10 TON 14 SEER PACKAGED HEAT PUMP SYSTEM 208-230V/3-PHASE; STANDARD EFFICIENCY
MODEL#WSC120H 3R0B005D
THERMOSTAT: WI-FI ECOBEE 

*   Install (2) 10-ton Package Unit 
*   Install Spiral Ducting in Gym with Registers for both units 
*   Cut in New Return with Return Grills
*   Electrical Whip with 3 Phase Fused Disconnect Box
*   Run thermostat wire and Install New Thermostats 
*   (MPU) Main Panel Upgrade with New Breakers for Both Systems. 
*   Run Electrical Wiring to Rooftop and through the back of stairs to other side where 2nd unit will be installed.
*   Seal all penetrations made for ductwork water tight, the existing openings (window) are made out of ply wood. We will be installing something more weatherproof.. possibly sheet metal transition. 
*  Crane rental 

Challenges? Working around the existing layout

Solutions? We troubleshooted adjusted the layout so that it was aesthetically pleasing (ducting)

Customer loved the finished work, and rehired us for some HVAC chang-outs for their offices.

Share URL copied!
https://www.thebluebook.com/iProView/1427445/k-k-heating-air/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.