MT2 LLC
Arvada, CO 80004
Featured Project Return to Projects List
JBLM McChord Field
Project Information
- Project Location:
- WA
- Status:
- Completed
- Structure Type:
- Misc Project
Scope Of Work
Overview
MT2 performed turnkey environmental firing range remediation at the former McChord Field firing range to allow redevelopment and expansion of the airfield. MT2 coordinated with multiple stakeholders including Versar, McChord AFB, and the US Army Corps of Engineers for the execution of this project.
MT2 Services
MT2 worked with multiple stakeholders to develop and implement an effective plan to reuse soils onsite; providing significant cost saving versus offsite transportation and disposal. MT2 conducted a site assessment including onsite analysis utilizing an XRF and offsite laboratory analysis; followed by site surveying to delineate the work area and document quantities of soils to be removed. MT2 installed stormwater control measures prior to starting work and implemented air monitoring controls while conducting the work. MT2 deployed in-situ ECOBONDĀ® treatment methods followed by surgical excavation to control quantities for removal and allow onsite reuse of soil. MT2 managed and completed the movement of soils following base security and traffic control requirements.