Hard Rock Stadium
Project Information
- Project Location:
- Miami Gardens, FL
- Status:
- Completed - Jan 2016
- Structure Type:
- Arena / Stadium
References
- General Contractor:
- Sign Language XL
Scope Of Work
On August 25, 2016, Jones Sign Company contracted to fabricate & install (2) 32′ tall by 52′ wide signs on the interior & (4) 36′ tall by 56′ wide signs on the exterior of Hard Rock Stadium – home of the Miami Dolphins of the NFL.
Jones Sign Company was to have completed fabrication & shipping from our manufacturing facility in Green Bay, WI, as well as installation of all 6 signs by September 24, in advance of the Dolphins’ home opener on September 25th. The installation of the stadium signs required an 800-ton crane to fly from the outside of the stadium so the turf was not damaged.
All work on the Stadium signage was completed on Thursday, September 23rd.
Hard Rock Stadium was so pleased with the work done by Jones Sign Company that they awarded them the secondary gate project that consisted of two Hard Rock Stadium Signs, two 14′ tall Gibson guitars, and a shelter in time for College Football’s Orange Bowl on December 31, 2016.