Designed and constructed a vacuum system to remove VOC from diesel contaminated ground.
Provided electrical drawings of the 500-HP fire water pump to the county of Santa Clara.
Designed and installed chilled water system
Installed 3 wells for ground water exraction complete with underground double contained piping, electrical and control panels.
Installed 4 steam heaters for heating approximately 5,000 square feet of industrial manufacturing space.
Provided electrical design for above ground gasoline and diesel tanks.
Installed pumps to provide breathing air to personnel during industrial operations.
Provided design and construction for the collection of contaminated ground water.
Designed HVAC for metrology lab which requires very tight temperature control.
Designed and fabricated speciallized Hydraulic-controlled industrial system. Installed several control valves, and control panel to throttle the flow.