Bridge 46 over Eno River

Project Information

Project Location:
NC
Approx Contract:
$4,000,000
Status:
Completed
Structure Type:
Bridge

References

Client:
North Carolina Department of Transportation

Scope Of Work

The existing bridge was originally constructed in 1941 and was considered structurally deficient, meaning it was safe to travel on but had reached the end of its useful life.

Conti was contracted to build a new structure that will last for the remainder of the 21st?century.?

Conti built a temporary, two-lane detour bridge adjacent to the existing structure that allowed travelers and commuters to cross the Eno River with no interruptions during the construction of the new bridge. The new bridge crossing the Eno along U.S. 70 Bypass features a 54-inch-tall concrete and metal railing, which will make the crossing along with the Eno much safer for bicycle traffic.

The newly constructed bridge is 27 feet longer, for a total of 265 feet, a foot wider, and is designed to accommodate a future greenway that could one day pass under the bridge.

Share URL copied!
https://www.thebluebook.com/iProView/1517263/conti-enterprises-inc/general-contractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.