Featured Project Return to Projects List
Arbor Ridge K-8 School
Project Information
- Project Location:
- Orlando, FL
- Status:
- Completed - Jul 2013
- Structure Type:
- Education (K-12)
References
- Architect:
- SchenkelShultz Architecture
Scope Of Work
Gilbane provided construction management services and bringing true value to Orange County Public Schools early in the Preconstruction Process
Gilbane was selected as the construction manager to build a new elementary school and renovate the existing buildings on-site to expand services and form a new K-8 campus. The project was designed to bring the existing modular style campus into the 21st century with interactive classrooms with smart board and wireless technology and allowed distance learning capabilities and increased audio-visual tools within the classrooms.
The addition was a two-story tilt-up structure that contained full science labs with demonstration desks, classrooms and connected to a new single story administration building. The remaining four buildings on campus were remodeled and included the media center and cafeteria. The entire campus was provided with a new single ply roofing system with attached covered walkways that lead to a new covered play structure as well as two playground lots.
Client Name: Orange County Public Schools
Project Name: Arbor Ridge K-8 School
Location: Orlando, FL
Architect: SchenkelShultz Architecture
Size: 89,500 Square Feet
Date Completed: July 2013
Type of construction: New
Delivery method: CM at Risk
Professional Services:
Preconstruction
The existing building originally contained an exterior covered walkway system that provided covered walkways to each of the buildings. The covered walkway system was removed and the space was enclosed into an interior air conditioned space that covered the campus.