Logo

Gilbane Building Co.

Share

Philadelphia, PA 19107

Company Info

  • Est. 1870
  • Size 500+ Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Meridian High School

Project Information

Project Location:
Falls Church, VA
Status:
Completed - Sep 2021
Structure Type:
Education (K-12)

References

Architect:
Stantec
Client:
City of Falls Church | Falls Church City Public Schools

Scope Of Work

What was once a vague dream for the Falls Church community, is now a reality thanks to the Gilbane and Stantec design-build team. After many meetings, deliberation and collaboration, the Gilbane team completed the new, $108 million Meridian High School (formerly George Mason High School) in Falls Church, VA.

The new Meridian High School is designed for a student capacity of 1,200 students, with a maximum of 1,500 students. The purpose of the new building is to promote collaborative learning and to foster independent learners, innovators and problem solvers. Whether students bike to school, carpool with neighbors or take the bus; they will all enter through the same entrance. Through that entrance, students, faculty and visitors enter the heart of the school where a stair connects all levels of the building. The school includes:

Counseling offices

Performing arts

Visual arts

Athletic facilities

Physical education

Cafeteria

Career and technical education

Fabrication and Robotics labs

Maker space

Core instruction spaces

Library and media services

Café

Flexible and collaborative areas were a priority for the school. Throughout design development, the team provided solutions to address these needs. For example, the third level acts as an innovation commons and a learning stair leads students from the commons to collaborative breakout areas on the fourth floor. To accommodate future flexibility, a three-classroom-wide breakout area is included on both the third and fourth floors. If enrollment increases significantly, this area can be fit-out for classrooms.

Designed to LEED Gold and Net Zero Ready, sustainable elements were a high priority for the community. In addition to green roofs on the third level, the building includes geothermal wells and bioretention areas around the site.

Share URL copied!
https://www.thebluebook.com/iProView/1577914/gilbane-building-co/general-contractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.