Logo

Treeline Construction, Inc

Share

Napa, CA 94558

Company Info

  • Size 20-49 Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Alviso Adobe

Project Information

Project Location:
Pleasanton, CA
Status:
Completed
Structure Type:
Park / Playground

Scope Of Work

This adobe was constructed in 1854. It was used as a dairy farm until 1969. There had been several alterations and one addition to the original building. Our scope of work for the City of Pleasanton was to structurally stabilize the adobe buildings using concrete bond beams on top of adobe walls, rehabilitate the adobe blocks and walls, replace the missing and severely damaged blocks with new blocks made on site from adobe excavated on site.

Treeline performed the rehabilitation of the Alviso Adobe under the direction of Chris Pattillo of PGA Architects in Oakland, CA.

The preservation efforts of this project also included an exterior plaster with a white wash finish, rebuilt doors and windows, repair and replacement of flooring.

The Alviso Adobe is now a museum for the City of Pleasanton and can be previewed online here

Share URL copied!
https://www.thebluebook.com/iProView/1585662/treeline-construction-inc/general-contractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.