Balfour Beatty
Malvern, PA 19355
Featured Project Return to Projects List
Mira Mesa High School Music & CTE Building
Project Information
- Project Location:
- San Diego, CA
- Approx Contract:
- $50,000,000
- Status:
- Completed - Jan 2020
- Structure Type:
- School / College / University
References
- Client:
- San Diego Unified School District
Scope Of Work
This project involved two DSA packages: Stage 1 (Music Building / Whole Site Modernization Buildings 100-600, Twain High and Portable Modernization), and Stage 2 CTE Project (Building 400 Room 416 – Shop and Outdoor Work Area). The new single-story 16,125-square-foot classroom buildings were constructed as well as a 14,800-square-foot single-story music building with two separate classrooms for band and orchestra. Modernization efforts for buildings to remain on campus included non-structural partition realignments to create six new classroom spaces within areas of Buildings 200, 300 and 400; improvements to exterior building envelopes and covered lunch areas; hardscape and landscape improvements; technology, electrical, mechanical, plumbing, and fire safety improvements; modifications to the pedestrian access to the campus; installing a new comms system; and internal classroom upgrades.