Hammond Water Treatment Plant
Project Information
- Project Location:
- IL
- Approx Contract:
- $3,000,000
- Status:
- Completed
- Structure Type:
- Sewage / Water Treatment Plant
References
- Owner:
- City of Hammond Indiana
- Architect:
- AECOM
Scope Of Work
SCOPE: Masonry, windows and roofing work
TIME FRAME: 365 Days
The Hammond Water Treatment plant was built in the 1930’s to Hammond, North Chicago and the surrounding areas. The entire building envelope was severely deteriorated by weather, age and close proximity to Lake Michigan.
There was an extended period of time between project scope identification and the project being issued for bid and awarded. During that time, the magnitude of the project grew significantly, but Tyler Lane Construction delivered all of the needed repairs at no additional cost and in only 27 extra days.
Our team spent a great deal of time reusing existing bricks to blend with the new to restore the building to the way it once looked. We coordinated our work with that of the plant, which was fully functioning during the entire construction process. Tyler Lane opened bowed walls, removed and replaced all steel lintels, demolished and rebuilt all severely deteriorated parapet walls, ground and tuck-pointed all exterior walls, replaced all exterior windows, removed and replaced the entire roof system, and repaired the damaged concrete roof deck, beams, columns and basins. Steel support brackets were fabricated and installed in key locations of stress.
During the restoration process, our crews worked in hazardous conditions over fully operational filter tanks, incurring no accidents. Because the work was federally funded, an inspection was required. The inspector said it was one of the most safely run projects he had ever visited.