Allterrain Paving & Construction LLC
New Albany, IN 47150
Featured Project Return to Projects List
Town of Clarksville - Progress Way
Project Information
- Project Location:
- IN
- Approx Contract:
- $5,000
- Status:
- Completed - Jun 2017
- Structure Type:
- Road / Highway
References
- Architect:
- Bradley Cummings- Public Works Director
- General Contractor:
- APC
- Client:
- Town of Clarksville
Scope Of Work
For this project we were sent in to fix the uneven and rough transition concerning where the roadway and the bridge meet. This transition had sunken over time which caused the roadway to be uncomfortable and unsafe for drivers. We were able to complete repairs on both ends of the bridge in 1 day causing minimal disruption to traffic flow on this busy roadway. For this project we used our Infrared Asphalt Recycler Machine, therefore there was no need of milling. With this technology we heated the existing asphalt back up to factory standards, and then we add rejuvenating oil, which brought the asphalt back to life. At this point we were able to rake the asphalt to properly distribute it, and at that time the asphalt is rolled and sealed to create a smooth and long lasting surface.