Malcolm Drilling Co., Inc.

San Francisco, CA 94105

Company Info

  • Est. 1962
  • Size 500+ Employees
  • Annual Vol Undisclosed

People Also View These
Loading...

Our Story

The goal of MALCOLM is to become the largest and most innovative specialty foundation contractor in North America by providing our clients with quality products and services consistent with or ahead of project specific requirements and schedules.

From upper level management, to project managers, to administrative support staff, from job superintendents to operating engineers, to laborers, Malcolm is committed to leadership, teamwork, integrity and safety at every level of the organization.

This commitment is but one reason that we retain employees at twice the national average for construction workers.

Our stable workforce is not only evidence of a stable organization, but also verifies a program dedicated to the growth and professional development of all of our employees, which enables us to better serve our clients.

Malcolm will continue to maintain profitability in order to facilitate capital investment back into the company in the form of state of practice equipment and cutting edge technology.

This program of capital reinvestment positions our equipment fleet at the forefront of the industry, which allows for early adoption of the most advanced means and methods of geotechnical construction. This is due in no small part to the fact that Malcolm is an independently owned company.

The synthesis of innovative, productive, stable and safe workforce and capital reinvestment, enables us to not only to expand our core services but allows us to fulfill our client’s needs on a broad geographic basis.

What We Do

Commercial Experience

Misc Project
Sewage / Water Treatment Plant

Regions & Counties Serviced

  • San Francisco, Oakland, San Jose

California All

Florida All

Nevada All

Texas All

Utah All

Washington All

Wisconsin All

Our CSI Codes

02 57 13 - Sinkhole Remediation by Grouting
02 57 13.13 - Sinkhole Remediation by Compaction Grouting
02 57 13.16 - Sinkhole Remediation by Cap Grouting
02 70 00.00.01 - Water Remediation
03 01 70 - Maintenance of Mass Concrete
03 06 60 - Schedules for Grouting
03 06 70 - Schedules for Mass Concrete
03 61 13 - Dry-Pack Grouting
03 62 13 - Non-Metallic Non-Shrink Grouting
03 62 16 - Metallic Non-Shrink Grouting
03 64 23 - Epoxy Injection Grouting
03 70 00.00.01 - Mass Concrete
03 71 00.00.01 - Mass Concrete for Raft Foundations
03 72 00.00.01 - Mass Concrete for Dams
31 23 19 - Dewatering
31 24 13 - Roadway Embankments
31 24 16 - Railway Embankments
31 32 13 - Soil Mixing Stabilization
31 32 13.13 - Asphalt Soil Stabilization
31 32 13.16 - Cement Soil Stabilization
31 32 13.19 - Lime Soil Stabilization
31 32 13.23 - Fly-Ash Soil Stabilization
31 32 13.26 - Lime-Fly-Ash Soil Stabilization
31 32 16 - Chemical Treatment Soil Stabilization
31 32 16.13 - Polymer Emulsion Soil Stabilization
31 32 19 - Geosynthetic Soil Stabilization and Layer Separation
31 32 19.13 - Geogrid Soil Stabilization
31 32 19.16 - Geotextile Soil Stabilization
31 32 23 - Pressure Grouting Soil Stabilization
31 32 23.13 - Cementitious Pressure Grouting Soil Stabilization
31 32 23.16 - Chemical Pressure Grouting Soil Stabilization
31 32 33 - Shotcrete Soil Slope Stabilization
31 32 36.16 - Grouted Soil Nailing
31 32 36.23 - Jet-Grouted Soil Nailing
31 32 36.26 - Launched Soil Nailing
31 33 13 - Rock Bolting and Grouting
31 33 23 - Rock Slope Netting
31 33 26 - Rock Slope Wire Mesh
31 33 43 - Vegetated Rock Slope Stabilization
31 35 19 - Geosynthetic Slope Protection
31 35 19.13 - Geogrid Slope Protection
31 35 19.16 - Geotextile Slope Protection
31 35 19.19 - Slope Protection with Mulch Control Netting
31 35 23 - Slope Protection with Slope Paving
31 35 23.13 - Cast-In-Place Concrete Slope Paving
31 35 26 - Containment Barriers
31 35 26.13 - Clay Containment Barriers
31 35 26.16 - Geomembrane Containment Barriers
31 35 26.23 - Bentonite Slurry Trench
31 43 13 - Pressure Grouting
31 43 13.13 - Concrete Pressure Grouting
31 43 13.16 - Polyurethane Pressure Grouting
31 43 16 - Compaction Grouting
31 62 13.26 - Pressure-Injected Footings
31 63 33 - Drilled Micropiles
31 72 13 - Rock Reinforcement and Initial Support
31 73 13 - Cement Tunnel Grouting
31 73 16 - Chemical Tunnel Grouting
32 11 33 - Cement-Treated Base Courses
32 32 34 - Reinforced Soil Retaining Walls
32 91 16 - Planting Soil Stabilization
32 91 16.13 - Blanket Planting Soil Stabilization
32 91 16.16 - Mat Planting Soil Stabilization
32 91 16.19 - Netting Planting Soil Stabilization
35 41 13 - Landside Levee Berms
35 41 13.13 - Stability Landside Levee Berms
35 41 13.16 - Seepage Landside Levee Berms
35 42 35 - Slope Protection Bank Protection
35 43 35 - Slope Protection Scour Protection
41 33 23 - Drilling Equipment
41 66 13 - Mobile Boring and Drilling Rigs
43 22 43 - Liquid Filters
43 22 43.13 - Cyclonic Liquid Filters
45 11 01 - Operation and Maintenance of Oil and Gas Extraction Equipment
45 11 06 - Schedules for Oil and Gas Extraction Equipment

Project Experience

  • Private
  • New Projects
  • Service Work/Repairs

Gallery

Featured Image 1
Brickell Flatiron
Featured Image 2
Brickell Flatiron
Featured Image 3
Brickell Flatiron
Featured Image 4
Oceanwide Center

Associations & Memberships

ADSC (The International Assn. of Foundation Drilling)
ADSC (The International Assn. of Foundation Drilling)
DFI (Deep Foundations Institute)
DFI (Deep Foundations Institute)
Geo-Institute
Geo-Institute
Share URL copied!
https://www.thebluebook.com/iProView/1616314/malcolm-drilling-co-inc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.