Malcolm Drilling Co., Inc.

San Francisco, CA 94105

Company Info

  • Est. 1962
  • Size 500+ Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Kings Arena

Project Information

Project Location:
Sacramento, CA
Status:
Completed
Structure Type:
Misc Project

Scope Of Work

After rumors of the Sacramento Kings moving to a new city, the decision was finally made that they would remain in Sacramento and build “the world’s greatest arena.” Malcolm was awarded a contract to install the foundation for the new Kings Arena located less than 10 blocks from the California State Capitol. After demolition of the existing shopping mall and mass excavation down to 20 feet, heavy rain–which California had not experienced in over 20 years–hit the site and delayed construction. To make up for this loss of time, Malcolm employed two drilling units to install a total of 983 Drilled Displacement (Omega) piles.

A comprehensive test pile program followed, and Malcolm proposed a larger pile diameter to utilize the competent shallow bearing layer, and reduce the overall number of piles. A combination of 18- and 24-inch diameter Omega piles were ultimately utilized. Automatic monitoring software was employed to track pile  installation parameters and provide as-build data. The project was completed successfully, and all piles were installed in a record time of 2 months over the 2014 winter holidays.

Project Images

#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/1616314/malcolm-drilling-co-inc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.