K
Featured Project Return to Projects List
Jack and St. Malo
Project Information
- Project Location:
- Ingleside, TX
- Status:
- Completed
- Structure Type:
- Renewable Energy
Scope Of Work
Kiewit fabricated the topsides and mooring piles for this semi-submersible platform.
Construction started in March of 2011 and the construction phase of the project ended in April of 2013. The modules, flare boom, and pipe bridges totaled more than 17,500 tons.
The hull arrived at our bulkhead on May 4th, 2013, and we completed the lift and set portion of the work on the May 26th. From that point on, Kiewit performed the integration and carryover work in support of the November 15th sail away date.
Fabricated: Ingleside, Texas
Installed: Gulf of Mexico