Equinix CH3

Project Information

Project Location:
Elk Grove Village, IL
Approx Contract:
$30,000,000
Status:
Completed
Structure Type:
Data Centers - Mission Critical

References

Architect:
Sheehan Partners
Client:
Equinix CH3

Scope Of Work

The Equinix CH3 data center is designed with power systems that have built-in redundancy, full Uninterruptible Power Supply (UPS) systems with N+1 levels or greater, and backup generator systems in the event of a local utility failure.

Clayco constructed the core and shell of the 240,000-square-foot Tier IV data center for Equinix, a provider of mission critical infrastructure services to businesses in 38 markets around the world.

The three-level, seismic design facility provides space for area companies to rent computer server locations for server backup and infrastructure. The 60-foot-tall building includes 19-foot floor-to-ceiling heights to accommodate mission critical equipment. The layout was designed to promote future expansion and is the largest of the company’s 35 data centers.

Equinix CH3 employs tight security with a 24×7 security team, biometric hand readers at every door leading to the cage, interlocking doors (“mantraps”), and scanning of all equipment entering and leaving the building.

Project Images

#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/1662134/clayco/general-contractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.