Fishing Wars Memorial Bridge

Project Information

Project Location:
WA
Status:
Completed
Structure Type:
Bridge

Scope Of Work

The new bridge, renamed in May 2019 to the Fishing Wars Memorial Bridge and delivered via the design-build delivery method, provides a gateway entrance to the City of Tacoma. A striking architectural feature on the main span accents the gateway experience with multiple frames that span above the roadway.  When viewed from any perspective the arrangement of the frames appears to shift from a seemingly random configuration to a graceful parabolic transition.

When the design for a replacement cable stay bridge proved financially unviable in 2013, the City of Tacoma had less than one year to complete several steps to protect the federal grants acquired to replace the bridge. From writing the design-build Request for Qualification and Proposal with draft documents under development by the Washington State Department of Transportation (to be used for the first time by a local jurisdiction under FHWA rules) to updating the National Environmental Protection Agency Environmental Document, there was no shortage of work to be done.

Atkinson Construction with design partner Jacobs was selected as the best value design-build proposer with  design of a 9-span continuous precast concrete girder bridge replacing F16 A&B and all of the F22 span. The design, which doubles the lane capability of the former bridge thereby enabling trucks to leave Port of Tacoma through the crossing, was challenged by the span length over the railroad mainlines and the clearance requirements of the existing and future track alignments. To stay under budget, the team devised a concrete girder design to span the 212-feet over six tracks and provide spans over Ramp B and access roadways. The design of the new structure was complicated spatially as it had to tie into the existing structure over the river and the existing roadway intersection and provide vertical and horizontal clearance to three future railroad spur lines in addition to the six mainline tracks. The pier alignment had to accommodate the varying alignments of the tracks and roadways below, resulting in skews that varied from zero to 45 degrees for the nine bridge piers.

Additional challenges faced and overcame included working within limited right-of-way adjacent to environmentally sensitive and tribal properties. The site is also subject to potentially large seismic forces and the soil conditions near the river required deep drilled shafts to support the bridge structure.

The new bridge provides a gateway entrance to the City of Tacoma with a striking architectural feature on the main span that accents the gateway experience with multiple frames that span above the roadway. This gateway framework can be replicated on future spans and the City felt tied well to the industrial area. In addition, iconic tribal symbols were placed at the ends of each pier cap and can be viewed from below the bridge.

Share URL copied!
https://www.thebluebook.com/iProView/1682288/jacobs-engineering/general-contractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.