Teehee Engineering, Inc.

Share

San Clemente, CA 92673

Company Info

  • Est. 2002
  • Size 20-49 Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Aliso Canyon VSTOL Helipad, MCB Camp

Project Information

Project Location:
Pendleton, CA
Approx Contract:
$400,000
Status:
Completed
Structure Type:
Government

Scope Of Work

Design-Bid-Build
Contract Value: $ 441,193

Construction of a 21,000 SF concrete helicopter pad located in Area 31 at MCB. The finish and tolerance of the concrete pad were held in strict accordance with similar Airfield Paving projects. This project required the over-excavation of the existing site, placement of select-fill materials and the concrete pad required a checker-board pattern with dowels at each construction joint. The perimeter airfield lighting was constructed utilizing solar panels and emergency battery backup. Other work included repair of site fencing, new rolling gate and hydro seeding of the disturbed areas.
 

Share URL copied!
https://www.thebluebook.com/iProView/1689325/teehee-engineering-inc/general-contractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.