Dual Redundant AC System and Back-up Generator Building 121, Naval Station
Project Information
- Project Location:
- San Diego, CA
- Approx Contract:
- $250,000
- Status:
- Completed
- Structure Type:
- Military
References
- Architect:
- GMH Associates, Inc
Scope Of Work
Design - Build
Vertical Construction
Contract Value: $264,802
DOR: GMH Associates, Inc.
The current split system air conditioners in the IT Room did not have adequate condensate drainage and posed a damage risk to computer equipment. The scope of work was to size, design, and build a dual redundant A/C system for the computer room. Each of the dual A/C units had to be able to carry the entire load of the computer room and must be tied into the Area Wide Energy Management System.
PPQ Rating: Excellent