B
Bowker Pinnacle Mechanical
Cedar Rapids, IA 52404
People Also View These
Loading...
Our Story
In business since 1928, locally owned Bowker Mechanical Contractors provides a full range of project services to a wide range of clients, including municipal, industrial, commercial, and residential entities.
Site development
Underground utilities
Excavating and grading
Plumbing
HVAC mechanical systems, including piping, system balancing, and temperature control systems
Process and clinical piping, including product handling and control systems
Commercial Experience
Regions & Counties Serviced
- Iowa, Omaha, NE
Iowa 1
- Linn
Our CSI Codes
01 89 13 - Site Preparation Performance Requirements
01 89 16 - Site Improvements Performance Requirements
01 89 19 - Site Plumbing Utilities Performance Requirements
01 89 23 - Site HVAC Utilities Performance Requirements
01 89 26 - Site Electrical Utilities Performance Requirements
01 89 29 - Other Site Construction Performance Requirements
02 32 19 - Exploratory Excavations
02 58 16 - Snow Avalanche Control
22 01 10 - Operation and Maintenance of Plumbing Piping and Pumps
22 01 30 - Operation and Maintenance of Plumbing Equipment
22 01 40 - Operation and Maintenance of Plumbing Fixtures
22 06 10 - Schedules for Plumbing Piping and Pumps
22 06 10.13 - Plumbing Pump Schedule
22 06 30.13 - Domestic Water Heater Schedule
22 10 00.00.01 - Plumbing Piping and Pumps
22 13 19.13 - Sanitary Drains
23 01 20 - Operation and Maintenance of HVAC Piping and Pumps
23 01 80 - Operation and Maintenance of Decentralized HVAC Equipment
23 06 20 - Schedules for HVAC Piping and Pumps
23 06 50.13 - Heating Boiler Schedule
23 06 80.16 - Convection Heating and Cooling Unit Schedule
23 20 00.00.01 - HVAC Piping and Pumps
31 06 20.13 - Trench Dimension Schedule
31 10 00.00.01 - Site Clearing
31 14 13.23 - Topsoil Stripping and Stockpiling
31 23 13 - Subgrade Preparation
31 30 00.00.01 - Earthwork Methods
32 01 30 - Operation and Maintenance of Site Improvements
32 06 30 - Schedules for Site Improvements
32 30 00.00.01 - Site Improvements
32 71 00.00.01 - Constructed Wetlands
32 72 00.00.01 - Wetlands Restoration
33 47 16.13 - Pond Covers
33 47 16.53 - Reservoir Covers
33 47 19.13 - Water Distribution Ponds
33 47 19.16 - Water Retainage Reservoirs
33 47 19.23 - Cooling Water Ponds
33 47 19.33 - Fire-Protection Water Ponds
33 47 23 - Sanitary Sewerage Lagoons
33 47 26 - Storm Drainage Ponds and Reservoirs
33 47 26.13 - Stabilization Ponds
33 47 26.16 - Retention Basins
33 47 26.19 - Leaching Pits
35 73 13 - Earth Embankment Dam