Scope Of Work

THE PROJECT

The Thornton Composite Reservoir Project included a 30-ft diameter connecting tunnel from the reservoir to the existing Calumet Deep Tunnel, a 20-ft diameter connecting tunnel from the reservoir to the Thorn Creek Diversion Tunnel and two abandoned mining haul tunnels. Grouting was required to create cut-off rings to reduce groundwater movement along the exterior of the tunnels and to tie into the double row grout curtain around the reservoir.

THE CHALLENGE

HBI was contracted to reduce the permeability of the bedrock to an approximate value of 1 Lugeon by drilling and grouting from inside the tunnels (tunnel grouting) in a 360-degree ring-pattern, drilling holes with strict alignment requirements and injecting a suite of balanced and stable grouts in multiple stages overhead.

THE SOLUTION

HBI used upstage and downstage techniques to complete the ring drilling and grouting operation. The grout hole lengths varied from 10 to 40 feet and were drilled with compact, limited access drills.

Project Images

#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/1717506/keller/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.