Seymour Johnson Rapid Jet Fuel Spill Response
Project Information
- Project Location:
- Goldsboro, NC
- Approx Contract:
- $150,000
- Status:
- Completed
- Structure Type:
- Misc Project
References
- Client:
- AFCEE
Scope Of Work
Key features
Rapid Response cleanup and repair
Tested 6 USTs over a 24-hour time period
Tested 11,632 linear-feet of 10-inch fuel line, containing 47,465 gallons of fuel
Work along active runway on active AFB
Restored and remediated site areas
Seymour Johnson AFB, NC, home to the 4th Fighter Wing and 916th Air refueling wing, had multiple leaks in their fuel piping previously installed in the 1950s.
At Seymour Johnson AFB, Conti performed investigation and repair of multiple pipeline leaks along a 10-inch JP-8 hydrant distribution pipeline under its Air Force contract to support the DESC testing program. The fueling system Conti inspected, prompting repair, consisted of five above ground storage tanks, 11,000 Lf of 10” steel pipeline and 8,000 lf of 8” steel pipeline. All tanks and piping were installed in 1958.
The team was tasked with determining the precise location, without excavation, of any leaks. However, due to the high groundwater and extensive contamination, numerous challenges were encountered and overcame while validating the leaks and repairing the pipeline. Multiple excavations were required in various locations to properly repair the leaking pipelines, along with building demolition.
Conti performed work around the clock during the evening and day time hours in coordination with the base schedule to avoid impacting the aircraft activities. Despite the challenges associated with site contamination, Conti this project ahead of schedule and with zero safety incidents.