Conti Federal
Edison, NJ 08817
Featured Project Return to Projects List
Shpack Radiological Superfund Site
Project Information
- Project Location:
- Norton, MA
- Approx Contract:
- $50,000,000
- Status:
- Completed
- Structure Type:
- Misc Project
References
- Client:
- USACE New England & Baltimore
Scope Of Work
Key features
?Excavation, segregation and removal of 58,000 cubic yards HTRW material
Design and construction of staging area
Installation of temporary housing units for and commercial sites
Expansion of existing mobile home park
Construction of base camp for temporary housing
Refurbishment of existing units
Construction and/or retrofitting of facilities
Conti's efforts resulted in the large-scale removal of radiological contaminants in a heterogeneous landfill matrix.
Contaminated by hazardous wastes dating back to the 1940s, the Shpack Superfund Site required remediation. Various organizations, including the New England District and Baltimore Districts (under two funding programs) of the United States Army Corps of Engineers (USACE) and the Environmental Protection Agency, saw this area as high priority for clean-up and spearheaded a large remediation project to clean the site.
Conti performed environmental remediation at Shpack, including excavation, screening, segregation, characterization, transportation and disposal of hazardous, toxic and radioactive waste contaminants under the Formerly Utilized Sites Remedial Action Program (FUSRAP) and Superfund actions. The team implemented time and cost saving measures, most notably developing a material segregation and discrete characterization process to reduce the volume of radiological materials. Conti made quick field decisions by operating an onsite gamma spectroscopy lab. In total, Conti excavated, screened and characterized nearly 58,000 cubic yards of material, transporting 51,000 cubic yards off-site. Conti oversaw the implementation of an investigation in accordance with the Multi-Agency Radiation Survey and Site Investigation Manual for the entire site to confirm the 9.4-acre site had been properly remediated.
The Shpack site posed extremely difficult conditions due to major wetland areas, so Conti utilized dewatering pumps during all excavation operations. Crews also used weir tanks to settle out contaminated sediments, helping to alleviate water issues.