Dustin Nagy Excavating

Bainbridge, PA 17502

Company Info

  • Est. 2008
  • Size 20-49 Employees
  • Annual Vol $10 million - $20 million

People Also View These
Loading...

Our Story

Our main lines of business include: Excavating Contractors, General Contractors, Underground Utilities--Contractors.

Dustin Nagy Excavating has been listed in the Blue Book since 2020.

What We Do

  • Excavating Contractors
  • General Contractors
  • Underground Utilities--Contractors

Regions & Counties Serviced

  • Pennsylvania-Eastern

Pennsylvania 1

  • Lancaster

Our CSI Codes

01 10 00.00.01 - Summary
01 11 16 - Work by Owner
01 11 13 - Work Covered by Contract Documents
01 11 19 - Purchase Contracts
01 12 13 - Summary of Contracts
01 12 16 - Work Sequence
01 12 19 - Contract Interface
01 14 13 - Access to Site
01 14 16 - Coordination with Occupants
01 14 19 - Use of Site
01 18 00.00.01 - Project Utility Sources
01 20 00.00.01 - Price and Payment Procedures
01 21 13 - Cash Allowances
01 21 16 - Contingency Allowances
01 21 19 - Testing and Inspecting Allowances
01 21 23 - Installation Allowances
01 21 26 - Product Allowances
01 21 29 - Quantity Allowances
01 21 43 - Time Allowances
01 22 13 - Unit Price Measurement
01 22 16 - Unit Price Payment
01 23 00.00.01 - Alternates
01 24 13 - Value Engineering
01 25 13 - Product Substitution Procedures
01 25 16 - Execution Substitution Procedures
01 26 13 - Requests for Interpretation
01 26 19 - Clarification Notices
01 26 33 - Minor Changes in the Work
01 26 36 - Supplemental Instructions
01 26 39 - Field Orders
01 26 43 - Amendments
01 26 46 - Construction Change Directives
01 26 49 - Work Change Directives
01 26 53 - Proposal Requests
01 26 54 - Proposal Worksheet Summaries
01 26 57 - Change Order Requests
01 26 63 - Change Orders
01 29 73 - Schedule of Values
01 29 76 - Progress Payment Procedures
01 29 83 - Payment Procedures for Testing Laboratory Services
01 30 00.00.01 - Administrative Requirements
01 31 13 - Project Coordination
01 31 16 - Multiple Contract Coordination
01 31 19 - Project Meetings
01 31 19.13 - Preconstruction Meetings
01 31 19.16 - Site Mobilization Meetings
01 31 19.23 - Progress Meetings
01 31 19.33 - Preinstallation Meetings
01 31 23 - Project Web Site
01 32 13 - Scheduling of Work
01 32 16 - Construction Progress Schedule
01 32 16.13 - Network Analysis Schedules
01 32 19 - Submittals Schedule
01 32 23 - Survey and Layout Data
01 32 26 - Construction Progress Reporting
01 32 29 - Periodic Work Observation
01 32 33 - Photographic Documentation
01 32 43 - Purchase Order Tracking
01 33 13 - Certificates
01 33 16 - Design Data
01 33 19 - Field Test Reporting
01 33 23 - Shop Drawings, Product Data, and Samples
01 33 26 - Source Quality Control Reporting
01 33 29 - Sustainable Design Reporting
01 35 13 - Special Project Procedures
01 35 13.13 - Special Project Procedures for Airport Facilities
01 35 13.16 - Special Project Procedures for Detention Facilities
01 35 13.19 - Special Project Procedures for Healthcare Facilities
01 35 13.43 - Special Project Procedures for Contaminated Sites
01 35 16 - Alteration Project Procedures
01 35 23 - Owner Safety Requirements
01 35 26 - Governmental Safety Requirements
01 35 29 - Health, Safety, and Emergency Response Procedures
01 35 29.13 - Health, Safety, and Emergency Response Procedures for Contaminated Sites
01 35 33 - Infection Control Procedures
01 35 43 - Environmental Procedures
01 35 43.13 - Environmental Procedures for Hazardous Materials
01 35 43.16 - Environmental Procedures for Toxic Materials
01 35 53 - Security Procedures
01 35 91 - Historic Treatment Procedures
01 40 00.00.01 - Quality Requirements
01 41 13 - Codes
01 41 16 - Laws
01 41 19 - Rules
01 41 23 - Fees
01 41 26 - Permits
01 42 13 - Abbreviations and Acronyms
01 42 16 - Definitions
01 42 19 - Reference Standards
01 43 13 - Manufacturer Qualifications
01 43 16 - Supplier Qualifications
01 43 19 - Fabricator Qualifications
01 43 23 - Installer Qualifications
01 43 26 - Testing and Inspecting Agency Qualifications
01 43 29 - Code-Required Special Inspector Qualifications
01 43 33 - Manufacturer’s Field Services
01 43 36 - Field Samples
01 43 39 - Mockups
01 45 13 - Source Quality Control Procedures
01 45 16 - Field Quality Control Procedures
01 45 16.13 - Contractor Quality Control
01 45 23 - Testing and Inspecting Services
01 45 26 - Plant Inspection Procedures
01 45 29 - Testing Laboratory Services
01 45 33 - Code-Required Special Inspections and Procedures
01 50 00.00.01 - Temporary Facilities and Controls
01 51 13 - Temporary Electricity
01 51 16 - Temporary Fire Protection
01 51 19 - Temporary Fuel Oil
01 51 23 - Temporary Heating, Cooling, and Ventilating
01 51 26 - Temporary Lighting
01 51 29 - Temporary Natural-Gas
01 51 33 - Temporary Telecommunications
01 51 36 - Temporary Water
01 52 13 - Field Offices and Sheds
01 52 16 - First Aid Facilities
01 52 19 - Sanitary Facilities
01 53 13 - Temporary Bridges
01 53 16 - Temporary Decking
01 53 19 - Temporary Overpasses
01 53 23 - Temporary Ramps
01 53 26 - Temporary Runarounds
01 54 13 - Temporary Elevators
01 54 16 - Temporary Hoists
01 54 19 - Temporary Cranes
01 54 23 - Temporary Scaffolding and Platforms
01 54 26 - Temporary Swing Staging
01 55 13 - Temporary Access Roads
01 55 16 - Haul Routes
01 55 19 - Temporary Parking Areas
01 55 23 - Temporary Roads
01 55 26 - Traffic Control
01 55 29 - Staging Areas
01 56 13 - Temporary Air Barriers
01 56 16 - Temporary Dust Barriers
01 56 19 - Temporary Noise Barriers
01 56 23 - Temporary Barricades
01 56 26 - Temporary Fencing
01 56 29 - Temporary Protective Walkways
01 56 33 - Temporary Security Barriers
01 56 36 - Temporary Security Enclosures
01 56 39 - Temporary Tree and Plant Protection
01 57 13 - Temporary Erosion and Sediment Control
01 57 16 - Temporary Pest Control
01 57 19 - Temporary Environmental Controls
01 57 23 - Temporary Storm Water Pollution Control
01 58 13 - Temporary Project Signage
01 58 16 - Temporary Interior Signage
01 60 00.00.01 - Product Requirements
01 61 13 - Software Licensing Requirements
01 62 00.00.01 - Product Options
01 64 00.00.01 - Owner-Furnished Products
01 65 00.00.01 - Product Delivery Requirements
01 66 13 - Product Storage and Handling Requirements for Hazardous Materials
01 66 16 - Product Storage and Handling Requirements for Toxic Materials
01 70 00.00.01 - Execution and Closeout Requirements
01 71 13 - Mobilization
01 71 16 - Acceptance of Conditions
01 71 23 - Field Engineering
01 71 23.13 - Construction Layout
01 71 23.16 - Construction Surveying
01 71 33 - Protection of Adjacent Construction
01 73 13 - Application
01 73 16 - Erection
01 73 19 - Installation
01 73 23 - Bracing and Anchoring
01 73 26 - Existing Products
01 73 29 - Cutting and Patching
01 74 13 - Progress Cleaning
01 74 16 - Site Maintenance
01 74 19 - Construction Waste Management and Disposal
01 74 23 - Final Cleaning
01 75 13 - Checkout Procedures
01 75 16 - Startup Procedures
01 76 00.00.01 - Protecting Installed Construction
01 77 13 - Preliminary Closeout Reviews
01 77 16 - Final Closeout Review
01 77 19 - Closeout Requirements
01 78 13 - Completion and Correction List
01 78 19 - Maintenance Contracts
01 78 23 - Operation and Maintenance Data
01 78 23.13 - Operation Data
01 78 23.16 - Maintenance Data
01 78 23.19 - Preventative Maintenance Instructions
01 78 29 - Final Site Survey
01 78 33 - Bonds
01 78 36 - Warranties
01 78 39 - Project Record Documents
01 78 43 - Spare Parts
01 78 46 - Extra Stock Materials
01 78 53 - Sustainable Design Closeout Documentation
01 79 00.00.01 - Demonstration and Training
01 80 00.00.01 - Performance Requirements
01 81 13 - Sustainable Design Requirements
01 81 16 - Facility Environmental Requirements
01 81 19 - Indoor Air Quality Requirements
01 82 13 - Foundation Performance Requirements
01 82 16 - Basement Construction Performance Requirements
01 83 13 - Superstructure Performance Requirements
01 83 16 - Exterior Enclosure Performance Requirements
01 83 19 - Roofing Performance Requirements
01 84 13 - Interior Construction Performance Requirements
01 84 16 - Stairways Performance Requirements
01 84 19 - Interior Finishes Performance Requirements
01 85 00.00.01 - Conveying Equipment Performance Requirements
01 86 13 - Fire Suppression Performance Requirements
01 86 16 - Plumbing Performance Requirements
01 86 19 - HVAC Performance Requirements
01 86 23 - Integrated Automation Performance Requirements
01 86 26 - Electrical Performance Requirements
01 86 29 - Communications Performance Requirements
01 86 33 - Electronic Safety and Security Performance Requirements
01 87 13 - Equipment Performance Requirements
01 87 16 - Furnishings Performance Requirements
01 88 13 - Special Construction Performance Requirements
01 88 16 - Selective Construction Performance Requirements
01 89 13 - Site Preparation Performance Requirements
01 89 16 - Site Improvements Performance Requirements
01 89 19 - Site Plumbing Utilities Performance Requirements
01 89 23 - Site HVAC Utilities Performance Requirements
01 89 26 - Site Electrical Utilities Performance Requirements
01 89 29 - Other Site Construction Performance Requirements
01 90 00.00.01 - Life Cycle Activities
01 91 13 - General Commissioning Requirements
01 91 16 - Facility Substructure Commissioning
01 91 16.13 - Foundation Commissioning
01 91 16.53 - Basement Construction Commissioning
01 91 19 - Facility Shell Commissioning
01 91 19.13 - Superstructure Commissioning
01 91 19.43 - Exterior Enclosure Commissioning
01 91 19.73 - Roofing Commissioning
01 91 23 - Interiors Commissioning
01 91 23.13 - Interior Construction Commissioning
01 91 23.43 - Stairways Commissioning
01 91 23.73 - Interior Finishes Commissioning
01 92 13 - Facility Operation Procedures
01 93 13 - Facility Maintenance Procedures
01 93 16 - Recycling Programs
01 94 13 - Facility Decommissioning Procedures
31 01 10 - Maintenance of Clearing
31 01 20 - Maintenance of Earth Moving
31 01 50 - Maintenance of Excavation Support and Protection
31 06 10 - Schedules for Clearing
31 06 20 - Schedules for Earth Moving
31 11 00.00.01 - Clearing and Grubbing
31 12 00.00.01 - Selective Clearing
31 14 13 - Soil Stripping and Stockpiling
31 14 13.13 - Soil Stripping
31 14 13.16 - Soil Stockpiling
31 14 16 - Sod Stripping and Stockpiling
31 14 16.13 - Sod Stripping
31 14 16.16 - Sod Stockpiling
31 20 00.00.01 - Earth Moving
31 22 13 - Rough Grading
31 22 16 - Fine Grading
31 22 19 - Finish Grading
31 22 19.13 - Spreading and Grading Topsoil
31 23 16 - Excavation
31 23 16.13 - Trenching
31 23 16.16 - Structural Excavation for Minor Structures
31 23 16.26 - Rock Removal
31 23 33 - Trenching and Backfilling
33 01 10 - Operation and Maintenance of Water Utilities
33 01 20 - Operation and Maintenance of Wells
33 01 30 - Operation and Maintenance of Sewer Utilities
33 01 30.13 - Sewer and Manhole Testing
33 01 30.16 - TV Inspection of Sewer Pipelines
33 01 30.51 - Maintenance of Sewer Utilities
33 01 30.52 - Pond and Reservoir Maintenance
33 01 30.61 - Sewer and Pipe Joint Sealing
33 01 30.62 - Manhole Grout Sealing
33 01 30.71 - Rehabilitation of Sewer Utilities
33 01 30.72 - Relining Sewers
33 01 50 - Operation and Maintenance of Fuel Distribution Lines
33 01 50.51 - Cleaning Fuel-Storage Tanks
33 01 50.71 - Lining of Steel Fuel-Storage Tanks
33 01 60 - Operation and Maintenance of Hydronic and Steam Energy Utilities
33 01 70 - Operation and Maintenance of Electrical Utilities
33 01 80 - Operation and Maintenance of Communications Utilities
33 05 13 - Manholes and Structures
33 05 13.13 - Manhole Grade Adjustment
33 05 16 - Utility Structures
33 05 16.13 - Precast Concrete Utility Structures
33 05 16.53 - Rebuilding Utility Structures
33 05 19 - Pressure Piping Tied Joint Restraint System
33 05 23 - Trenchless Utility Installation
33 05 23.13 - Utility Horizontal Directional Drilling
33 05 23.16 - Utility Pipe Jacking
33 05 23.19 - Microtunneling
33 05 23.23 - Utility Pipe Ramming
33 05 23.26 - Utility Impact Moling
33 05 23.29 - Cable Trenching and Plowing
33 05 26 - Utility Line Signs, Markers, and Flags
33 06 10 - Schedules for Water Utilities
33 06 20 - Schedules for Wells
33 06 30 - Schedules for Sanitary Sewerage Utilities
33 06 40 - Schedules for Storm Drainage Utilities
33 06 40.13 - Storm Drainage Schedule
33 06 50 - Schedules for Fuel Distribution Utilities
33 06 60 - Schedules for Hydronic and Steam Energy Utilities
33 06 70 - Schedules for Electrical Utilities
33 06 80 - Schedules for Communications Utilities
33 08 10 - Commissioning of Water Utilities
33 08 20 - Commissioning of Wells
33 08 30 - Commissioning of Sanitary Sewerage Utilities
33 08 40 - Commissioning of Storm Drainage Utilities
33 08 50 - Commissioning of Fuel Distribution Utilities
33 08 60 - Commissioning of Hydronic and Steam Energy Utilities
33 08 70 - Commissioning of Electrical Utilities
33 08 80 - Commissioning of Communications Utilities
33 09 10 - Instrumentation and Control for Water Utilities
33 09 20 - Instrumentation and Control for Wells
33 09 30 - Instrumentation and Control for Sanitary Sewerage Utilities
33 09 40 - Instrumentation and Control for Storm Drainage Utilities
33 09 50 - Instrumentation and Control for Fuel Distribution Utilities
33 09 60 - Instrumentation and Control for Hydronic and Steam Energy Utilities
33 09 70 - Instrumentation and Control for Electrical Utilities
33 09 80 - Instrumentation and Control for Communications Utilities
33 10 00.00.01 - Water Utilities
33 11 13 - Public Water Utility Distribution Piping
33 11 16 - Site Water Utility Distribution Piping
33 11 19 - Fire Suppression Utility Water Distribution Piping
33 12 13 - Water Service Connections
33 12 13.13 - Water Supply Backflow Preventer Assemblies
33 12 16 - Water Utility Distribution Valves
33 12 19 - Water Utility Distribution Fire Hydrants
33 12 23 - Water Utility Pumping Stations
33 12 33 - Water Utility Metering
33 13 00.00.01 - Disinfecting of Water Utility Distribution
33 16 13 - Aboveground Water Utility Storage Tanks
33 16 13.13 - Steel Aboveground Water Utility Storage Tanks
33 16 13.16 - Prestressed Concrete Aboveground Water Utility Storage Tanks
33 16 16 - Underground Water Utility Storage Tanks
33 16 19 - Elevated Water Utility Storage Tanks
33 20 00.00.01 - Wells
33 21 13 - Public Water Supply Wells
33 21 16 - Irrigation Water Wells
33 22 00.00.01 - Test Wells
33 23 00.00.01 - Extraction Wells
33 24 13 - Groundwater Monitoring Wells
33 25 00.00.01 - Recharge Wells
33 26 00.00.01 - Relief Wells
33 29 00.00.01 - Well Abandonment
33 30 00.00.01 - Sanitary Sewerage Utilities
33 31 13 - Public Sanitary Utility Sewerage Piping
33 31 16 - Industrial Waste Utility Sewerage Piping
33 32 13 - Packaged Utility Lift Stations
33 32 13.13 - Packaged Sewage Lift Stations, Wet Well Type
33 32 16 - Packaged Utility Wastewater Pumping Stations
33 32 16.13 - Packaged Sewage Grinder Pumping Units
33 32 19 - Public Utility Wastewater Pumping Stations
33 33 13 - Sanitary Utility Sewerage
33 33 16 - Combined Utility Sewerage
33 34 13 - Sanitary Utility Sewerage Inverted Siphons
33 36 13 - Utility Septic Tank and Effluent Wet Wells
33 36 16 - Utility Septic Tank Effluent Pumps
33 36 33 - Utility Drainage Field
33 39 13 - Sanitary Utility Sewerage Manholes, Frames, and Covers
33 39 23 - Sanitary Utility Sewerage Cleanouts
33 40 00.00.01 - Storm Drainage Utilities
33 41 13 - Public Storm Utility Drainage Piping
33 42 13 - Pipe Culverts
33 42 13.13 - Public Pipe Culverts
33 42 16 - Concrete Culverts
33 42 16.13 - Precast Concrete Culverts
33 42 16.16 - Cast-in-Place Concrete Culverts
33 44 13 - Utility Area Drains
33 44 13.13 - Catchbasins
33 44 16 - Utility Trench Drains
33 44 19 - Utility Storm Water Treatment
33 44 19.13 - In-Line Utility Storm Water Filters
33 44 19.16 - Catch Basin Insert Utility Storm Water Filters
33 44 19.19 - Utility Oil and Gas Separators
33 45 00.00.01 - Storm Utility Drainage Pumps
33 46 13 - Foundation Drainage
33 46 13.13 - Foundation Drainage Piping
33 46 13.16 - Geocomposite Foundation Drainage
33 46 16 - Subdrainage Piping
33 46 16.13 - Subdrainage Piping
33 46 16.16 - Geocomposite Subdrainage
33 46 16.19 - Pipe Underdrains
33 46 19 - Underslab Drainage
33 46 19.13 - Underslab Drainage Piping
33 46 19.16 - Geocomposite Underslab Drainage
33 46 23 - Drainage Layers
33 46 23.16 - Gravel Drainage Layers
33 46 23.19 - Geosynthetic Drainage Layers
33 46 26 - Geotextile Subsurface Drainage Filtration
33 46 33 - Retaining Wall Drainage
33 47 13 - Pond and Reservoir Liners
33 47 13.13 - Pond Liners
33 47 13.53 - Reservoir Liners
33 47 16 - Pond and Reservoir Covers
33 47 16.13 - Pond Covers
33 47 16.53 - Reservoir Covers
33 47 19 - Water Ponds and Reservoirs
33 47 19.13 - Water Distribution Ponds
33 47 19.16 - Water Retainage Reservoirs
33 47 19.23 - Cooling Water Ponds
33 47 19.33 - Fire-Protection Water Ponds
33 47 23 - Sanitary Sewerage Lagoons
33 47 26 - Storm Drainage Ponds and Reservoirs
33 47 26.13 - Stabilization Ponds
33 47 26.16 - Retention Basins
33 47 26.19 - Leaching Pits
33 49 13 - Storm Drainage Manholes, Frames, and Covers
33 49 23 - Storm Drainage Water Retention Structures
33 50 00.00.01 - Fuel Distribution Utilities
33 51 13 - Natural-Gas Piping
33 51 33 - Natural-Gas Metering
33 52 13 - Fuel-Oil Distribution
33 52 13.13 - Fuel-Oil Piping
33 52 13.23 - Fuel-Oil Pumps
33 52 16 - Gasoline Distribution
33 52 16.13 - Gasoline Piping
33 52 16.23 - Gasoline Pumps
33 52 19 - Diesel Fuel Distribution
33 52 19.13 - Diesel Fuel Piping
33 52 19.23 - Diesel Fuel Pumps
33 52 43 - Aviation Fuel Distribution
33 52 43.13 - Aviation Fuel Piping
33 52 43.16 - Aviation Fuel Connections
33 52 43.19 - Aviation Fuel Grounding
33 52 43.23 - Aviation Fuel Pumps
33 56 13 - Aboveground Fuel-Storage Tanks
33 56 16 - Underground Fuel-Storage Tanks
33 56 43 - Aviation Fuel-Storage Tanks
33 56 43.13 - Aboveground Aviation Fuel-Storage Tanks
33 56 43.16 - Underground Aviation Fuel-Storage Tanks
33 56 53 - Compressed Gases Storage Tanks
33 60 00.00.01 - Hydronic and Steam Energy Utilities
33 61 13 - Underground Hydronic Energy Distribution
33 61 23 - Aboveground Hydronic Energy Distribution
33 61 33 - Hydronic Energy Distribution Metering
33 63 13 - Underground Steam and Condensate Distribution Piping
33 63 23 - Aboveground Steam and Condensate Distribution Piping
33 63 33 - Steam Energy Distribution Metering
33 70 00.00.01 - Electrical Utilities
33 71 13 - Electrical Utility Towers
33 71 13.13 - Precast Concrete Electrical Utility Towers
33 71 13.23 - Steel Electrical Utility Towers
33 71 13.33 - Wood Electrical Utility Towers
33 71 16 - Electrical Utility Poles
33 71 16.13 - Precast Concrete Electrical Utility Poles
33 71 16.23 - Steel Electrical Utility Poles
33 71 16.33 - Wood Electrical Utility Poles
33 71 19 - Electrical Underground Ducts and Manholes
33 71 19.13 - Electrical Manholes and Handholes
33 71 23 - Insulators and Fittings
33 71 23.13 - Suspension Insulators
33 71 23.16 - Post Insulators
33 71 23.23 - Potheads
33 71 26 - Transmission and Distribution Equipment
33 71 26.13 - Capacitor Banks
33 71 26.16 - Coupling Capacitors
33 71 26.23 - Current Transformers
33 71 26.26 - Potential Transformers
33 71 36 - Extra-High-Voltage Wiring
33 71 36.13 - Overhead Extra-High-Voltage Wiring
33 71 39 - High-Voltage Wiring
33 71 39.13 - Overhead High-Voltage Wiring
33 71 39.23 - Underground High-Voltage Wiring
33 71 39.33 - Underwater High-Voltage Wiring
33 71 49 - Medium-Voltage Wiring
33 71 49.13 - Overhead Medium-Voltage Wiring
33 71 49.23 - Underground Medium-Voltage Wiring
33 71 49.33 - Underwater Medium-Voltage Wiring
33 71 53 - Direct-Current Transmission
33 71 73 - Electrical Utility Services
33 71 73.33 - Electric Meters
33 71 83 - Transmission and Distribution Specialties
33 72 13 - Deadend Structures
33 72 23 - Structural Bus Supports
33 72 23.13 - Bus Support Insulators
33 72 26 - Substation Bus Assemblies
33 72 26.13 - Aluminum Substation Bus Assemblies
33 72 26.16 - Copper Substation Bus Assemblies
33 72 33 - Control House Equipment
33 72 33.13 - Relays
33 72 33.16 - Substation Control Panels
33 72 33.23 - Power-Line Carriers
33 72 33.26 - Substation Metering
33 72 33.33 - Raceway and Boxes for Utility Substations
33 72 33.36 - Cable Trays for Utility Substations
33 72 33.43 - Substation Backup Batteries
33 72 33.46 - Substation Converter Stations
33 72 43 - Substation Control Wiring
33 73 13 - Liquid-Filled Utility Transformers
33 73 23 - Dry-Type Utility Transformers
33 75 13 - Air High-Voltage Circuit Breaker
33 75 16 - Oil High-Voltage Circuit Breaker
33 75 19 - Gas High-Voltage Circuit Breaker
33 75 23 - Vacuum High-Voltage Circuit Breaker
33 75 36 - High-Voltage Utility Fuses
33 75 39 - High-Voltage Surge Arresters
33 75 43 - Shunt Reactors
33 77 13 - Air Medium-Voltage Circuit Breaker
33 77 16 - Oil Medium-Voltage Circuit Breaker
33 77 19 - Gas Medium-Voltage Circuit Breaker
33 77 23 - Vacuum Medium-Voltage Circuit Breaker
33 77 26 - Medium-Voltage Utility Fusible Interrupter Switchgear
33 77 33 - Medium-Voltage Utility Cutouts
33 77 36 - Medium-Voltage Utility Fuses
33 77 39 - Medium-Voltage Utility Surge Arresters
33 77 53 - Medium-Voltage Utility Reclosers
33 79 13 - Site Improvements Grounding
33 79 13.13 - Electric Fence Grounding
33 79 16 - Tower Grounding
33 79 16.13 - Communications Tower Grounding
33 79 16.16 - Antenna Tower Grounding
33 79 19 - Utilities Grounding
33 79 19.13 - Electrical Utilities Grounding
33 79 19.16 - Communications Utilities Grounding
33 79 23 - Utility Substation Grounding
33 79 83 - Site Grounding Conductors
33 79 83.13 - Grounding Wire, Bar, and Rod
33 79 83.16 - Chemical Rod
33 79 83.23 - Conductive Concrete
33 79 83.33 - Earth Grounding Enhancement
33 79 83.43 - Deep Earth Grounding
33 79 93 - Site Lightning Protection
33 79 93.13 - Lightning Strike Counters
33 79 93.16 - Lightning Strike Warning Devices
33 80 00.00.01 - Communications Utilities
33 81 13 - Communications Transmission Towers
33 81 16 - Antenna Towers
33 81 19 - Communications Utility Poles
33 81 23 - Aerial Cable Installation Hardware
33 81 26 - Communications Underground Ducts, Manholes, and Handholes
33 81 29 - Communications Vaults, Pedestals and Enclosures
33 81 33 - Communications Blowers, Fans, and Ventilation
33 82 13 - Copper Communications Distribution Cabling
33 82 13.13 - Copper Splicing and Terminations
33 82 23 - Optical Fiber Communications Distribution Cabling
33 82 23.13 - Optical Fiber Splicing and Terminations
33 82 33 - Coaxial Communications Distribution Cabling
33 82 33.13 - Coaxial Splicing and Terminations
33 82 43 - Grounding and Bonding for Communications Distribution
33 82 46 - Cable Pressurization Equipment
33 82 53 - Cleaning, Lubrication and Restoration Chemicals
33 83 13 - Laser Transmitters and Receivers
33 83 16 - Microwave Transmitters and Receivers
33 83 19 - Infrared Transmitters and Receivers
33 83 23 - UHF/VHF Transmitters and Antennas
35 41 16 - Levee Cutoff Trenches

Project Experience

  • Non-Union
  • Prevailing Wages (Davis Bacon)
  • Public
  • Private
  • New Projects
  • Service Work/Repairs
  • Projects From $10,000 to $5,000,000
Share URL copied!
https://www.thebluebook.com/iProView/1764943/dustin-nagy-excavating/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.