Logo

BRYCON Construction

Share

Chandler, AZ 85226

Company Info

  • Est. 1990
  • Size 500+ Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Octopus PECVD Tool Installation

Project Information

Project Location:
Tempe, AZ
Status:
Completed
Structure Type:
Laboratory

References

Owner:
Arizona State University

Scope Of Work

This project consisted of two parts, the first to build an addition to a Laser Lab allowing users to move out of the existing space, and the second, to remodel that lab into a Class 100 cleanroom. This new clean room houses the Octopus Tool, a PECVD (Plasma Etched Chemical Vapor) deposition tool that is instrumental in the process used to deposit thin films from a gas state to a solid state, used in this case in the research and development of solar panels. The tool required extensive expansion to a number of lethal gases from the sub-fab area to the researcher’s Lab which was performed by Brycon’s in-house high purity process piping division.

Project Images

#
#
Share URL copied!
https://www.thebluebook.com/iProView/257163/brycon-construction/general-contractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.