Featured Project Return to Projects List

Boston Preparatory Charter School

Project Information

Project Location:
Hyde Park, MA
Approx Contract:
$30,000,000
Status:
Completed - Aug 2018
Structure Type:
School / College / University

References

Owner:
Boston Preparatory Charter School
Architect:
Studio G Architects, Boston, MA

Scope Of Work

The student population at Boston Preparatory Charter School has been growing and space became limited within the existing building, creating a need for the school to rent additional buildings in separate locations. Looking for a solution to bring their students all back together in one state-of-the-art learning facility, W.T. Rich was hired to build their new school. 

Phase 1: This phase included the construction of a new 49,800 SF facility consisting of a middle school, high school and gymnasium.  The new school building includes administrative offices, classrooms, cafeteria with full commercial kitchen and a storage area. The gymnasium was a standalone pre-engineered metal structure that tied into the new school. 

Prior to the completion of Phase 1, Boston Prep won the annual lottery and was awarded more chairs than they had applied for, thus leading to a second expansion of the new school.  

Phase 2: This phase included the construction of a 32,804 SF addition to the existing new middle and high school. The expansion is a three-story structure with classrooms, science labs, academic support spaces and an additional cafeteria. The adjacent new school building was fully occupied and operational throughout construction of this phase. 

HIGHLIGHTS & CHALLENGES

Construction took place on a tight urban site with three sides adjacent to residential neighborhoods. Safety and communication were key with Boston Prep staff and the surrounding local residents. 

During excavation, foundation ledge was encountered.  Due to our depth of experience, W.T. Rich handled this unaccounted for obstruction with ease; our team was able to manage the cost appropriately and adjust the workflow to stay on schedule.  The hammered ledge was re-used for site retention. 

W.T. Rich created a cost savings for Boston Prep by re-using project soils as urban fill to raise grades in the parking lot.  This saved the project in trucking and disposal costs. 

Another significant cost savings for this project was the utilization of a prefabricated metal panel gymnasium that tied into the existing steel structure. 

 

 

 

PROJECT INFORMATION

Location: Hyde Park, MA

Completion: 

Phase I: August 2017

Phase II: August 2018

Contract Value: 

Phase I: $16.3 million

Phase II: $12.2 million

Size: 

Phase I: 49,500 SF

Phase II: 35,000 SF

Type:  New Construction and Addition

Owner: Boston Preparatory Charter School

Designer: Studio G Architects, Boston, MA

Delivery Method: CM-at-Risk (M.G.L. Chapter 149A)

Contact WT Rich

RESULTS

W.T. Rich worked closely with Boston Prep to give them the best school facility for the best value. This project in its entirety was completed on-time and under budget. 

Project Images

#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/266377/rich-w-t-co-inc/general-contractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.