Southeastern Vocational High School
Project Information
- Project Location:
- South Easton, MA
- Approx Contract:
- $30,000,000
- Status:
- Completed - Jan 2013
- Structure Type:
- School / College / University
References
- Owner:
- SRVTHS
- Architect:
- Drummey Rosane Anderson Inc., Waltham, MA
Scope Of Work
The Southeastern Regional Vocational Technical High School (SRVTHS) project consisted of selective renovation throughout the existing school, a new gymnasium and locker room addition, and a much-needed facelift to school grounds. Specific renovation scope included a new kitchen, cafeteria, science rooms, bathrooms, shop spaces (Electrical, Plumbing, HVAC, Carpentry, Metal Fabrication and Machining), media center, cosmetology, nurses’ station, as well as general classroom upgrades. The entire existing school was outfitted with a new air conditioning system, new unit ventilators, new fire alarm system and sprinkler protection throughout. All construction work was completed in several phases in order to maintain full operation of all normal school activities.
HIGHLIGHTS
Renovation in conjunction with new addition
Full preconstruction services with extensive collaboration
Early construction packages for demolition and abatement
Occupied facility with critical work performed during summer
Highly confined worksite with limited laydown area
Major structural steel retrofit work that required significant shoring and structural expertise
Facility had to be upgraded for life safety and code compliance
MBE/WBE targets achieved
Sustainable design elements (MA-CHPS)
MSBA financed project
PROJECT INFORMATION
Location: South Easton, MA
Completion: 2013
Contract Value: $27.6 million
Size: 280,000 SF
Type: Addition / Renovation
Owner: SRVTHS
Designer: Drummey Rosane Anderson Inc., Waltham, MA
Delivery Method: CM-at-Risk (M.G.L. Chapter 149A)
Contact WT Rich
CHALLENGES & SOLUTIONS
Limited Budget – Large scope requirement on a limited budget of $98.50 per GSF. Faced with this challenge, W.T. Rich spearheaded an extensive value engineering effort and conducted aggressive scoping and buyout on behalf of the owner, ultimately achieving $3 million in cost savings and establishing a GMP that met the owner’s budgetary requirements
Heavily Phased – The SRVTHS was occupied throughout construction. W.T. Rich Company committed itself to performing work with the least possible disruption or inconvenience to the school, its staff, the students and the learning environment. Through thoughtful and proactive planning and coordination with the school and our subcontractors, W.T. Rich managed the project efficiently, safely, and with virtually no adverse impact on the school or its operations
Streamlined Schedule – The original schedule presented in the RFP consisted of a completion date of September 2014. W.T. Rich proposed and implemented an alternate schedule that included early construction of the new addition and better management of swing spaces, resulting in a revised deadline of December 2013. W. T. Rich completed the project ahead of this more aggressive timeline
RESULTS
In the face of budgetary and phasing issues, W.T. Rich was able to work in partnership with the broader project team to complete the project with outstanding results. All phases were completed on time and the project was delivered on budget.