Baker Concrete Construction
Monroe, OH 45050
Featured Project Return to Projects List
Compartment B Pump Stations G 434, G436
Project Information
- Project Location:
- West Palm Beach, FL
- Status:
- Completed - Sep 2010
- Structure Type:
- Sewage / Water Treatment Plant
References
- Owner:
- South Florida Water Mgmt. District
- Architect:
- n/a
- General Contractor:
- n/s
- Client:
- Harry Pepper & Associates
Scope Of Work
G-434 is a water pump station located in the heart of the Florida Everglades. The unique location along with the stringent specifications required coordination, planning, and knowledge, all of which Baker provided. The G-434 consists of approximately 20,230 cubic yards of concrete and 1,800 ton of resteel. The pump station has a foot print of 158' x 154'.
G-436 is a water pump station located about 5 miles away from pump G-434. Water pump G-436 was built in similar fashion as the G-434. The G-436 pump scope consists of approximately 22,000 cubic yards of concrete and 1,910 tons of resteel. The pump station has a foot print of 140' x 135