Logo

Baker Concrete Construction

Monroe, OH 45050

Company Info

  • Est. 40
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Methodist Outpatient Care Center

Project Information

Project Location:
Houston, TX
Status:
Completed - Aug 2008
Structure Type:
Hospital / Nursing Home

References

Owner:
Methodist Health Care System
Architect:
N/A
General Contractor:
N/A
Client:
Hensel Phelps Construction Company

Scope Of Work

Hensel Phelps Construction Company awarded a contract to Baker for the total concrete package.  The 25-floor comprehensive outpatient care center is located in the Texas Medical Center  It is a part of the Methodist Hospital's expansion plan to improve patient care and increase their presence in the community.




Design Assist: During the schematics process, Baker was involved by the client to review the drawings. The original design had the garage as a post tension beam and slab (6 floors) and the upper floors were regular reinforced pan slabs. After review, Baker recommended the use of one set of equipment instead of the two proposed and to do the entire project using pan slab. This was a cost savings as only one set of equipment was required.

 

Project Images

#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/285746/baker-concrete-construction/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.