Cascade Hydro-Air
Portland, OR 97209
Featured Project Return to Projects List
Redmond Airport
Project Information
- Project Location:
- WA
- Status:
- Completed
- Structure Type:
- Misc Project
Scope Of Work
A major terminal addition to Roberts Field Redmond Municipal Airport with control of several major HVAC systems.
- Boiler hot water generation, distribution and flow monitoring system.
- Central refrigeration equipment, such as: chillers, cooling towers, power purification system and condenser water system.
- Several variable air volume air handling units and associated terminal units both with and without hydronic reheat.
- Radiant floor heating.
- Hydronic fin tube heaters.
- Infrared unit heaters.
- Multiple exhaust fans.