Logo

Accurate Group, Inc.

Lincolnshire, IL 60069

Home Contact Us

Company Info

  • Est. 1994
  • Size 500+ Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

I-294 Roadway and Bridge Reconstruction Construction Management

Project Information

Project Location:
IL
Status:
Completed
Structure Type:
Road / Highway

References

Client:
Illinois State Toll Highway Authority

Scope Of Work

Accurate Group, Inc. provided material testing and construction inspection services for the project. Responsibilities included testing, surveying, and monitoring of main lane PCC pavement, bituminous shoulder pavement and 3” base pavement for the main lane, retaining walls, abutments, wing walls, deck concrete pour, parapet and movement slab walls, slope walls, parapet/median barrier walls and ramp construction. On-site placement monitoring, testing, and sampling of PCC pavements included taking slump tests, air content, and temperature, and casting cylinders. Nuclear density testing was performed on the Hot Mix Asphalt and aggregate placement.

Share URL copied!
https://www.thebluebook.com/iProView/330985/accurate-group-inc/engineers/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.